Three alternatives investiments are proposed in the table below. Considering a minimum rate of return on investiment of 11%. Maintenance is 16% of invest cost per year. Which is the best investiment?
1 | 2 | 3 | |
Invest cost | 25500 | 31000 | 33500 |
annual value saved with investiment | 7200 | 8600 | 9500 |
annual operating costs | 150 | 250 | 300 |
Project |
1 |
2 |
3 |
Invest cost |
25500 |
31000 |
33500 |
annual value saved with investment |
7200 |
8600 |
9500 |
annual operating costs |
150 |
250 |
300 |
annual maintenance cost-16% of initial investment |
4080 |
4960 |
5360 |
net income |
2970 |
3390 |
3840 |
Percentage rate of return = net income/initial investment |
11.65% |
10.94% |
11.46% |
For selection purpose project 1 & 3 would be selected on the basis of rate of return as ROR is greater than minimum required return of 11%But amount the two project A would be selected as its ROR is greater than 3 |