Question

Tri-bikes manufactures two different levels of bicycles: the Standard and the Extreme. The total overhead of...

Tri-bikes manufactures two different levels of bicycles: the Standard and the Extreme. The total overhead of $300,000 has traditionally been allocated by direct labor hours, with 140,000 hours for the Standard and 60,000 hours for the Extreme. After analyzing and assigning costs to two cost pools, it was determined that machine hours is estimated to have $200,000 of overhead, with 4,000 hours used on the Standard product and 1,000 hours used on the Extreme product. It was also estimated that the setup cost pool would have $100,000 of overhead, with 1,000 hours for the Standard and 1,500 hours for the Extreme. What is the overhead rate per product, under traditional and under ABC costing?

Traditional ABC
Overhead per Standard product $ $
Overhead per Extreme product $ $

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Assign overhead using traditional costing and ABC. Standard Custom Direct labor costs    $50,000    $100,000...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Assign overhead using traditional costing and ABC. Standard Custom Direct labor costs    $50,000    $100,000...
VidPlayers, Inc. manufactures two types of DVD players, a deluxe model anda standard model. The deluxe...
VidPlayers, Inc. manufactures two types of DVD players, a deluxe model anda standard model. The deluxe model is a multi-format progressive-scan DVD player withnetworking capability, Dolby digital, and DTS decoder. The standard model’s primary fea-ture is progressive-scan. Annual production is 20,000 units for the deluxe and 50,000 unitsfor the standard.Both products require 2 hours of direct labor for completion. Therefore, total annualdirect labor hours are 140,000 or [2 hrs.±(20,000²50,000)]. Expected annual manu-facturing overhead is $980,000. Thus, the predetermined overhead rate...
Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use...
Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company’s operations. Standard Custom Direct labor costs $50,000 $100,000 Machine hours 1,500 1,500 Setup hours 90 420...
HRE Wheels Inc. manufactures two products: standard wheels and carbon fiber wheels. To determine the amount...
HRE Wheels Inc. manufactures two products: standard wheels and carbon fiber wheels. To determine the amount of overhead to assign to each product line, the controller has developed the following information. Assign overhead using traditional costing and ABC. Standard      Carbon Fiber Estimated wheels produced        40,000         10,000 Direct labor hours per wheel 1                 3 Total estimated overhead costs for the two product lines are $770,000. Instructions Compute the overhead cost assigned to the standard wheels and carbon fiber...
Coronado has budgeted overhead costs of $1,134,000. It has allocated overhead on a plantwide basis to...
Coronado has budgeted overhead costs of $1,134,000. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 540,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
EcoFabrics has budgeted overhead costs of $963,900. It has allocated overhead on a plantwide basis to...
EcoFabrics has budgeted overhead costs of $963,900. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 459,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
EcoFabrics has budgeted overhead costs of $1,030,050. It has allocated overhead on a plantwide basis to...
EcoFabrics has budgeted overhead costs of $1,030,050. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 490,500 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
EcoFabrics has budgeted overhead costs of $1,077,300. It has allocated overhead on a plantwide basis to...
EcoFabrics has budgeted overhead costs of $1,077,300. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 513,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
Sheridan Industries has three activity cost pools and two products. It estimates production 2,000 units of...
Sheridan Industries has three activity cost pools and two products. It estimates production 2,000 units of Product BC113 and 1,000 of Product AD908. Having identified its activity cost pools and the cost drivers for each pool, Sheridan accumulated the following data relative to those activity cost pools and cost drivers. Annual Overhead Data Estimated Use of Cost Drivers per Product Activity Cost Pools Cost Drivers Estimated Overhead Estimated Use of Cost Drivers per Activity Product BC113 Product AD908 Machine setup...