Question

Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...

Way Cool produces two different models of air conditioners. The company produces the mechanical systems in its components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow.

Process Activity Overhead Cost Driver Quantity
Components Changeover $ 500,000 Number of batches 800
Machining 279,000 Machine hours 6,000
Setups 225,000 Number of setups 120
$ 1,004,000
Finishing Welding $ 180,300 Welding hours 3,000
Inspecting 210,000 Number of inspections 700
Rework 75,000 Rework orders 300
$ 465,300
Support Purchasing $ 135,000 Purchase orders 450
Providing space 32,000 Number of units 5,000
Providing utilities 65,000 Number of units 5,000
$ 232,000

   
Additional production information concerning its two product lines follows.

Model 145 Model 212
Units produced 1,500 3,500
Welding hours 800 2,200
Batches 400 400
Number of inspections 400 300
Machine hours 1,800 4,200
Setups 60 60
Rework orders 160 140
Purchase orders 300 150

  
Required:
1. Determine departmental overhead rates and compute the overhead cost per unit for each product line. Base your overhead assignment for the components department on machine hours. Use welding hours to assign overhead costs to the finishing department. Assign costs to the support department based on number of purchase orders.
2. Determine the total cost per unit for each product line if the direct labor and direct materials costs per unit are $250 for Model 145 and $180 for Model 212.
3. If the market price for Model 145 is $820 and the market price for Model 212 is $480, determine the profit or loss per unit for each model.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in its components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. Process Activity Overhead Cost Driver Quantity Components Changeover $ 480,000 Number of batches 770 Machining 313,000 Machine hours 8,420 Setups 229,000 Number of setups 80 $ 1,022,000 Finishing Welding $ 194,000...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. (Loss amounts should be indicated with a minus sign. Round your intermediate calculations and round "Cost per unit and OH rate" answers to 2 decimal places.) Process Activity Overhead Cost Driver...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. (Loss amounts should be indicated with a minus sign. Round your intermediate calculations and round "Cost per unit and OH rate" answers to 2 decimal places.)    Process Activity Overhead Cost...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. (Loss amounts should be indicated with a minus sign. Round your intermediate calculations and round "Cost per unit and OH rate" answers to 2 decimal places.) Process Activity Overhead Cost Driver...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. Process Activity Overhead Cost Driver Quantity Components Changeover $ 448,950 Number of batches 730 Machining 399,784 Machine hours 8,470 Setups 288,800 Number of setups 160 $ 1,137,534 Finishing Welding $ 233,220...
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the...
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding Department. Other parts and the subassembly are then assembled in the Assembly Department. The activities, expected costs, and drivers associated with these two manufacturing processes are given below. Process Activity Cost Activity Driver Expected Quantity Cutting and Welding Welding $ 776,000    Welding hours 4,000 Machining 450,000    Machine hours 10,000 Inspecting 448,250    No. of inspections 1,000 Materials handling 300,000...
10. Vertex Tires manufactures tires for dune buggies and has two different products, nubby tires and...
10. Vertex Tires manufactures tires for dune buggies and has two different products, nubby tires and smooth tires. The company produces 5,000 nubby tires and 10,000 smooth tires each year and incurs $167,000 of overhead costs. The following information is available:      Activity       Total Cost         Cost Driver   Materials handling $60,000       Number of requisitions Machine setups      50,000       Number of setups Quality inspections 57,000       Number of inspections For the nubby tires, the company has 400 requisitions, 200 setups, and 200...
Zeus Industries manufactures two types of electrical power units, custom and standard, which involve four factory...
Zeus Industries manufactures two types of electrical power units, custom and standard, which involve four factory overhead activities—production setup, procurement, quality control, and materials management. An activity analysis of the overhead revealed the following estimated activity costs and activity bases for these activities: Activity Activity Cost Activity Base Production setup $ 81,000 Number of setups Procurement 145,000 Number of purchase orders (PO) Quality control 188,500 Number of inspections Materials management 80,000 Number of components Total $494,500 The activity-base usage quantities...
1. Foxx Company incurs $410000 overhead costs each year in its three main departments, setup ($35000),...
1. Foxx Company incurs $410000 overhead costs each year in its three main departments, setup ($35000), machining ($265000), and packing ($110000). The setup department performs 40 setups per year, the machining department works 5000 hours per year, and the packing department packs 500 orders per year. Information about Foxx’s two products is as follows: Product A1 Product B1 Number of setups      20     20 Machining hours   1000 4000 Orders packed    150    350 Number of products manufactured    600    400 If machining hours...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...