Question

Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following...

Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives
National Technology, LTD. has developed the following activity cost information for its manufacturing activities:

Activity Activity Cost
Machine setup $60.00 per batch
Movement 15.00 per batch
0.10 per pound
Drilling 3.00 per hole
Welding 4.00 per inch
Shaping 25.00 per hour
Assembly 18.00 per hour
Inspection 2.00 per unit

Filling an order for a batch of 50 fireplace inserts that weighed 100 pounds each required the following:
• Four batch moves
• Two sets of inspections
• Drilling ten holes in each unit
• Completing 100 inches of welds on each unit
• Forty-five minutes of shaping for each unit
• One hour of assembly per unit

Determine the activity cost of converting the raw materials into 50 fireplace inserts.

Round answers to the nearest whole number, if applicable.

Fireplace Inserts
Activity Cost
Set-up Answer
Movement
Batch Answer
Weight Answer
Inspection Answer
Drilling Answer
Welding Answer
Shaping Answer
Assembly Answer
Total Answer

Homework Answers

Answer #1

Calculation of Activity Based Cost

Activity Cost $
Set up cost

60

Movement
Batch(4 batch move*15 per batch)

60

Weight(100 pounds*.10 per pound*4 batch move *50) 2000
Inspectors (2 sets of inspectors*2 per unit*50) 200
Drilling (10 holes in each unit*3 per hole *50) 1500
Welding (100 inches for each unit*4 per inch*50) 20000
Shaping (25per hour*(45/60)*50) 938
Assembly (18 per hour*1 hour*50) 900
TOTAL 25658

(Answer is rounded off)

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following activity cost information for its manufacturing activities: Activity Activity Cost Machine setup $70.00 per batch Movement 20.00 per batch 0.10 per pound Drilling 3.00 per hole Welding 8.00 per inch Shaping 29.00 per hour Assembly 18.00 per hour Inspection 2.00 per unit Filling an order for a batch of 50 fireplace inserts that weighed 150 pounds each required the following: • Three batch moves...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following activity cost information for its manufacturing activities: Activity Activity Cost Machine setup $60.00 per batch Movement 15.00 per batch 0.10 per pound Drilling 3.00 per hole Welding 4.00 per inch Shaping 25.00 per hour Assembly 18.00 per hour Inspection 2.00 per unit Filling an order for a batch of 50 fireplace inserts that weighed 100 pounds each required the following: • Four batch moves...
Stage 2 ABC for Manufacturing: Reassigning Costs to Cost Objectives Regal Products has developed the following...
Stage 2 ABC for Manufacturing: Reassigning Costs to Cost Objectives Regal Products has developed the following activity cost information for its manufacturing activities: Activity Activity cost Machine setup $60.00 per batch Movement 15.00 per batch move 0.10 per pound Drilling 5.00 per hole Welding 2.00 per inch Shaping 25.00 per hour Assembly 19.00 per hour Inspection 2.00 per unit Filling an order for a batch of 50 fireplace inserts (each insert weighing 150 pounds) required the following: Three batch moves...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information for its 2016 manufacturing activities: Budgeted Activity Cost Activity Cost Driver at Practical Capacity Purchasing and materials handling $675,000 900,000 kilograms Setup 700,000 1,120 setups Machine operations 954,000 12,000 hours First unit inspection 50,000 1,000 batches Packaging 250,000 312,500 units Actual 2016 production information is as follows: Standard Product A Standard Product B Specialty Products Units 150,000 100,000 50,000 Batches 100 80 600 Setups*...
Activity-Based Budget Highlands Industries has the following budget information available for February: Units manufactured 25,000 Factory...
Activity-Based Budget Highlands Industries has the following budget information available for February: Units manufactured 25,000 Factory administration $145,000 Assembly 0.25 hour per unit X $20 Direct materials 3 pounds per unit X $6 Inspection $40 per batch of 1,000 units Manufacturing overhead $8 per unit Product development $50,000 Setup cost $100 per batch of 1,000 units Use activity-based costing to prepare a manufacturing cost budget for February. Clearly distinguish between unit, batch, and facility-level costs. HighlandsIndustries Activity-Based Manufacturing Cost Budget...
Activity-Based Budget Macon Industries has the following budget information available for February: Units manufactured 30,000 Factory...
Activity-Based Budget Macon Industries has the following budget information available for February: Units manufactured 30,000 Factory administration $60,000 Assembly 0.5 hour per unit X $12 Direct materials 2 pounds per unit X $7 Inspection $600 per batch of 1,000 units Manufacturing overhead $7 per unit Product development $20,000 Setup cost $14 per batch of 1,000 units Use activity based costing to prepare a manufacturing cost budget for February. Clearly distinguish between unit, batch, and facility-level costs. Macon Industries Activity-Based Manufacturing...
Tidwell Industries has the following overhead costs and cost drivers. Direct labor hours are estimated at...
Tidwell Industries has the following overhead costs and cost drivers. Direct labor hours are estimated at 100000 for the year. Activity Cost Pool Cost Driver Est. Overhead Cost Driver Activity Ordering and Receiving Orders $   140000 500 orders Machine Setup Setups 315000 450 setups Machining Machine hours 1562500 125000 MH Assembly Parts 1240000 1000000 parts Inspection Inspections 320000 500 inspections If overhead is applied using activity-based costing, the overhead application rate for ordering and receiving is $0.14 per part. $280...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials handling Number of parts $ 0.3 Machinery Number of machine hours 56 Assembly Number of parts 3.10 Inspection Number of finished units 35 Drilling has just completed 85 units of a component for a customer. Each unit required 105 parts and 3.25 machine hours. The prime cost is $1,350 per finished unit. All other manufacturing costs are classified as manufacturing overhead. Required: 1. Compute...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials handling Number of parts $ 0.60 Machinery Number of machine hours 51.00 Assembly Number of parts 2.85 Inspection Number of finished units 30.00 Drilling has just completed 80 units of a component for a customer. Each unit required 100 parts and 3 machine hours. The prime cost is $1,300 per finished unit. All other manufacturing costs are classified as manufacturing overhead. Required: 1. Compute...
Lonsdale Inc. manufactures entry and dining room lighting fixtures. Five activities are used in manufacturing the...
Lonsdale Inc. manufactures entry and dining room lighting fixtures. Five activities are used in manufacturing the fixtures. These activities and their associated budgeted activity costs and activity bases are as follows: Activity Budgeted Activity Cost Activity Base Casting $344,760 Machine hours Assembly 231,200 Direct labor hours Inspecting 38,080 Number of inspections Setup 33,360 Number of setups Materials handling 43,680 Number of loads Corporate records were obtained to estimate the amount of activity to be used by the two products. The...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT