Question

Perez Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager....

Perez Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager. The production department’s static budget and actual results for 2019 follow: Static Budget Actual Results Production in units 21,000 kits 22,300 kits Direct materials $ 165,900 $ 213,670 Direct labor 144,900 148,070 Variable manufacturing overhead 31,500 35,650 Total variable costs 342,300 397,390 Fixed manufacturing overhead 213,000 208,000 Total manufacturing cost $ 555,300 $ 605,390 Required a. Convert the static budget into a flexible budget. b. Calculate the variances.

Convert the static budget into a flexible budget. (Do not round intermediate calculations.)

Flexible Budget
Production in units 22,300 Kits
Direct materials
Direct labor
Variable manufacturing overhead
Total variable costs
Fixed manufacturing overhead
Total manufacturing costs

Calculate the variances. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance).)

Variances
Direct materials
Direct labor
Variable manufacturing overhead
Total variable costs
Fixed manufacturing overhead
Total manufacturing costs

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Rooney Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager....
Rooney Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager. The production department’s static budget and actual results for 2019 follow: Static Budget Actual Results Production in units 21,000 kits 22,800 kits Direct materials $ 136,500 $ 185,200 Direct labor 115,500 118,200 Variable manufacturing overhead 31,500 37,700 Total variable costs 283,500 341,100 Fixed manufacturing overhead 208,000 202,800 Total manufacturing cost $ 491,500 $ 543,900 Required a. Convert the static budget into a flexible budget....
Zachary Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager....
Zachary Medical Equipment Company makes a blood pressure measuring kit. Jason McCoy is the production manager. The production department’s static budget and actual results for 2019 follow: Static Budget Actual Results Production in units 40,000 kits 41,000 kits Direct materials $ 256,000 $ 300,000 Direct labor 216,000 215,200 Variable manufacturing overhead 60,000 64,000 Total variable costs 532,000 579,200 Fixed manufacturing overhead 205,000 199,800 Total manufacturing cost $ 737,000 $ 779,000 Required a. Convert the static budget into a flexible budget....
The following data were drawn from the records of Perez Corporation. Planned volume for year (static...
The following data were drawn from the records of Perez Corporation. Planned volume for year (static budget) 3,000 units Standard direct materials cost per unit 2.30 pounds @ $ 1.60 per pound Standard direct labor cost per unit 2.20 hours @ $ 3.50 per hour Total expected fixed overhead costs $ 13,200 Actual volume for the year (flexible budget) 3,200 units Actual direct materials cost per unit 1.80 pounds @ $ 2.20 per pound Actual direct labor cost per unit...
Perez Manufacturing Company established the following standard price and cost data: Sales price $ 8.30 per...
Perez Manufacturing Company established the following standard price and cost data: Sales price $ 8.30 per unit Variable manufacturing cost $ 4.00 per unit Fixed manufacturing cost $ 2,500 total Fixed selling and administrative cost $ 600 total Perez planned to produce and sell 2,200 units. Actual production and sales amounted to 2,300 units. Assume that the actual sales price is $7.95 per unit and that the actual variable cost is $4.15 per unit. The actual fixed manufacturing cost is...
Blossom, Inc. prepared the following master budget items for July:       Production and sales 28,000 units...
Blossom, Inc. prepared the following master budget items for July:       Production and sales 28,000 units   Variable manufacturing costs:      Direct materials $ 28,000      Direct labor $ 61,000      Variable manufacturing overhead $ 42,000   Fixed manufacturing costs $ 130,000   Total manufacturing costs $ 261,600     During July, Blossom actually sold 34,000 units. Prepare a flexible budget for Blossom based on actual sales. (Do not round your intermediate calculations.) Production and Sales UNITS Variable manufacturing costs Direct materials Direct labor Variable manufacturing overhead...
A company has prepared a master budget for the month of February when they expected to...
A company has prepared a master budget for the month of February when they expected to sell 4,000 units. They actually sold 3,750 units. Calculate the flexible budget and the spending and volume variances for February. Identify if the variances are favorable or unfavorable. Actual Costs 3,750 Units Spending Variances Flexible Budget _______Units Volume Variances Master Budget 4,000 Units Manufacturing Costs: Direct Materials $14,500 $16,000 Direct Labor 38,500 40,000 Variable Manufacturing Overhead 12,000 14,000 Fixed Manufacturing Overhead 20,000 21,000 Total...
GreatGreat Fender allocates manufacturing overhead to production based on standard direct labor hours. GreatGreat Fender reported...
GreatGreat Fender allocates manufacturing overhead to production based on standard direct labor hours. GreatGreat Fender reported the following actual results for 2016​: actual number of fenders​ produced ,20,000​; actual variable​ overhead,$5,300​; actual fixed​ overhead,$27,000​; actual direct labor​ hours,370. Read the requirements . Requirement 1. Compute the overhead variances for the​ year: variable overhead cost​ variance, variable overhead efficiency​ variance, fixed overhead cost​ variance, and fixed overhead volume variance. Begin with the variable overhead cost and efficiency variances. Select the required​...
GreatGreat Fender allocates manufacturing overhead to production based on standard direct labor hours. GreatGreat Fender reported...
GreatGreat Fender allocates manufacturing overhead to production based on standard direct labor hours. GreatGreat Fender reported the following actual results for 2016​: actual number of fenders​ produced ,20,000​; actual variable​ overhead,$5,300​; actual fixed​ overhead,$27,000​; actual direct labor​ hours,370. Read the requirements . Requirement 1. Compute the overhead variances for the​ year: variable overhead cost​ variance, variable overhead efficiency​ variance, fixed overhead cost​ variance, and fixed overhead volume variance. Begin with the variable overhead cost and efficiency variances. Select the required​...
The Brown Manufacturing​ Company's costing system has two​ direct-cost categories: direct materials and direct manufacturing labor....
The Brown Manufacturing​ Company's costing system has two​ direct-cost categories: direct materials and direct manufacturing labor. Manufacturing overhead​ (both variable and​ fixed) is allocated to products on the basis of standard direct manufacturing labor hours​ (DLH). At the beginning of 2014 Brown adopted the following standards for its manufacturing​ costs:  Direct materials 3 lbs. at $4 per lb. $12.00 Direct manufacturing labor 4 hrs. at $20 per hr. 80.00 Manufacturing overhead: Variable $6 per DLH 24.00 Fixed $7 per DLH...
1) Determining Budgeted Overhead The overhead application rate for a company is $12 per unit, made...
1) Determining Budgeted Overhead The overhead application rate for a company is $12 per unit, made up of $7 per unit of fixed overhead and $5 per unit of variable over- head. Normal capacity is 10,000 units. In one month, there was a favorable flexible budget variance of $2,500. Actual overhead for the month was $110,000 and actual units produced were 15,125. Based on this information, determine the amount of the budgeted overhead for the actual level of production. 2)...