Question

PLEASE answer all of the follwing, thank you! The Ramapo Company produces two products, Blinks and...

PLEASE answer all of the follwing, thank you!

The Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and Assembly. Data for the products and departments are listed below.


Product
Number of
Units
Labor Hours
Per Unit
Machine Hours
Per Unit
Blinks 1,171 1 5
Dinks 1,954 7 6

All of the machine hours take place in the Fabrication department, which has an estimated overhead of $93,900. All of the labor hours take place in the Assembly department, which has an estimated total overhead of $77,200.

The Ramapo Company uses a single overhead rate to apply all overhead costs based on labor hours. What is the overhead cost per unit for Blinks?

a.$77.21

b.$80.66

c.$67.00

d.$11.52

Panamint Systems Corporation is estimating activity costs associated with producing disk drives, tapes drives, and wire drives. The indirect labor can be traced to four separate activity pools. The budgeted activity cost and activity base data by product are provided below.


Activity Cost

Activity Base
Procurement $344,200 Number of purchase orders
Scheduling $200,200 Number of production orders
Materials handling $462,200 Number of moves
Product development $729,600 Number of engineering changes
Production $1,474,600 Machine hours

Number of
Purchase
Orders

Number of
Production
Orders

Number
of
Moves

Number of
Engineering
Changes


Machine
Hours

Number
of
Units
Disk drives 3,910 340 1,350 11 2,000 2,400
Tape drives 2,200 205 500 3 9,800 4,400
Wire drives 11,000 720 4,300 28 10,000 2,300

Determine the activity rate for product development per change.

a.$8,686

b.$78,171

c.$17,371

d.$36,480

Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. The following table presents information about estimated overhead and direct labor hours.


Overhead
Direct
Labor Hours (dlh)
Product
A B
Painting Dept. $256,100 12,000 dlh 5 dlh 12 dlh
Finishing Dept. 86,500 10,200 5 8
    Totals $342,600 22,200 dlh 10 dlh 20 dlh

Using a single plantwide rate, determine the overhead rate per unit for Blue Ridge Marketing Inc.'s Product B.

$154.30

$15.43

$106.71

$308.60

Homework Answers

Answer #1

Answer:-1)-Total labor hours=(1171 units*1 hour per unit)+ (1954 units*7 hour per unit)

=$1171 hours+13678 hours

=14849 hours

Total overhead cost =$93900+$77200 =$171100

The overhead cost per unit for Blinks= Total overhead cost/ Total labor hours

=$171100/14849 hours

=$11.52 per hour

2)- The activity rate for product development per change=Product development cost/ No. Of engineering changes

=$729600/(11+3+28)

=$729600/42

=$17371

3)- Using a single plantwide rate, determine the overhead rate per unit for Blue Ridge Marketing Inc.'s Product B= Total overhead cost/ Total labor hours

=$342600/22200 hours

=$15.43

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and...
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours Per Unit Machine Hours Per Unit Blinks 1,000     4         5         Dinks 2,000     2         8         All of the machine hours take place in the Fabrication Department, which has an estimated overhead of $84,000. All of the labor hours take place in the Assembly Department, which has an estimated...
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and...
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours Per Unit Machine Hours Per Unit Blinks 925 2 5 Dinks 2,235 5 8 All of the machine hours take place in the Fabrication department, which has an estimated overhead of $103,300. All of the labor hours take place in the Assembly department, which has an estimated...
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and...
Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours Per Unit Machine Hours Per Unit Blinks 1,005 3 6 Dinks 2,245 2 7 All of the machine hours take place in the Fabrication department, which has an estimated overhead of $94,100. All of the labor hours take place in the Assembly department, which has an estimated...
Chapter 18 The Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two...
Chapter 18 The Ramapo Company produces two products, Blinks and Dinks. They are manufactured in two departments, Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Labor Hours Per Unit Machine Hours Per Unit Blinks 999 4 4 Dinks 2,126 6 7 All of the machine hours take place in the Fabrication department, which has an estimated overhead of $86,000. All of the labor hours take place in the Assembly department, which has...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. The following table presents information about the estimated overhead and direct labor hours.    Overhead   Direct Labor Hours (dlh)   Product A    B Painting Dept.   $256,200      11,400   dlh      14   dlh   6   dlh Finishing Dept.   76,300      9,000        ...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. The following table presents information about estimated overhead and direct labor hours. Overhead Direct Labor Hours (dlh) Product A B Painting Dept. $248,000 10,000 dlh 16 dlh 4 dlh Finishing Dept. 72,000 10,000 4 16     Totals $320,000 20,000 dlh 20 dlh...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. The following table presents information about estimated overhead and direct labor hours. Overhead Direct Labor Hours (dlh) Product A B Painting Dept. $272,300 8,900 dlh 14 dlh 2 dlh Finishing Dept. 74,100 8,300 5 18 Totals $346,400 17,200 dlh 19 dlh...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single...
Blue Ridge Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. The following table presents information about estimated overhead and direct labor hours. Overhead Direct Labor Hours (dlh) Product A B Painting Dept. $529,209 12,700 dlh 15 dlh 2 dlh Finishing Dept. 69,864 8,200 5 18     Totals $599,073 20,900 dlh 20 dlh...
MANAGERIAL ACCOUNTING Q1: Panamint Systems Corporation is estimating activity costs associated with producing disk drives, tapes...
MANAGERIAL ACCOUNTING Q1: Panamint Systems Corporation is estimating activity costs associated with producing disk drives, tapes drives, and wire drives. The indirect labor can be traced to four separate activity pools. The budgeted activity cost and activity base data by product are provided below. Activity Cost Activity Base Procurement $350,600 Number of purchase orders Scheduling $200,500 Number of production orders Materials handling $453,600 Number of moves Product development $702,000 Number of engineering changes Production $1,431,900 Machine hours Number of Purchase...
Single Plantwide and Multiple Production Department Factory Overhead Rate Methods and Product Cost Distortion The management...
Single Plantwide and Multiple Production Department Factory Overhead Rate Methods and Product Cost Distortion The management of Firebolt Industries Inc. manufactures gasoline and diesel engines through two production departments, Fabrication and Assembly. Management needs accurate product cost information in order to guide product strategy. Presently, the company uses a single plantwide factory overhead rate for allocating factory overhead to the two products. However, management is considering the multiple production department factory overhead rate method. The following factory overhead was budgeted...