1. Aztec Builders allocates manufacturing overhead to
jobs based on machine hours. The company has the following
estimated costs for the upcoming year:
Direct materials used $25,000
Direct labour costs $62,000
Salary of factory supervisor $50,000
Advertising expense $33,000
Heating and lighting costs for factory $51,000
Depreciation on factory equipment $19,000
Sales commissions $8,000
The firm estimates that 1,800 direct labour hours will be worked in
the upcoming year, while 2,000 machine hours will be used during
the year. The predetermined indirect allocation rate per machine
hour is closest to
a. $56.
b. $36.
c. $60.
d. $45.
e. $40.
2. Blockbuster Entertainment manufactures digital video equipment.
For each unit $500 of direct material is used and there is $1,500
of direct manufacturing labour at $30 per hour. Manufacturing
overhead is applied at $35 per direct manufacturing labour hour.
Calculate the cost of each unit.
a. $4,975
b. $4,025
c. $3,750
d. $4,150
e. $4,725
3. In an activity-cost pool
a. a measure of the activity performed serves as the cost
allocation base.
b. the costs have a cause-and-effect relationship with the
cost-allocation base for that activity.
c. the cost pools are homogeneous over time.
d. costs in a cost pool can always be traced directly to
products.
e. each pool pertains to a narrow and focused set of costs.
Answer the following question(s) using the information below.
Peter’s Printers has contracts to complete weekly supplements
required by forty-six customers. For the year 2019, manufacturing
overhead cost estimates total $360,000 for an annual production
capacity of 7.2 million pages.
For 2019, Peter’s Printers has decided to evaluate the use of
additional cost pools. After analyzing manufacturing overhead
costs, it was determined that number of design changes, setups, and
inspections are the primary manufacturing overhead cost drivers.
The following information was gathered during the analysis:
Cost pool Manufacturing overhead costs Activity level
Design changes $60,000 400 design changes
Setups 260,000 5,000 setups
Inspections 40,000 10,000 inspections
Total manufacturing overhead costs $360,000
During 2019, two customers, World Makers and Happy Studios, are
expected to use the following printing services:
Activity World Makers Happy Studios
Pages 60,000 76,000
Design changes 10 0
Setups 20 10
Inspections 30 38
4. What is the cost driver rate if manufacturing overhead costs are
considered one large cost pool and are assigned based on 7.2
million pages of production capacity?
a. $0.05 per page
b. $0.035 per page
c. $0.35 per page
d. $0.025 per page
e. $0.045 per page
5. Using pages printed as the only overhead cost driver, what is
the manufacturing overhead cost estimate for World Makers during
2019?
a. $2,500
b. $21,000
c. $3,000
d. $2,700
e. $2,100
6. Assuming activity-cost pools are used, what are the
activity-cost driver rates for design changes, setups, and
inspections cost pools?
a. $200 per change, $64 per setup, $5 per inspection
b. $150 per change, $52 per setup, $5 per inspection
c. $150 per change, $64 per setup, $5 per inspection
d. $150 per change, $52 per setup, $4 per inspection
e. $200 per change, $5 per setup, $64 per inspection
Short Answer
The following costs are attributed to the Quilt Company:
Purchase of raw materials (all direct) $297,100
Direct labour cost $141,800
Manufacturing overhead costs $175,160
Inventories:
Beginning raw materials $10,000
Ending raw materials $900
Beginning work in process $20,000
Ending work in process $10,800
Beginning finished goods $20,000
Ending finished goods $5,800
Quilt Company used a 120% predetermined overhead rate based on
direct labour cost.
Required:
7. Calculate the cost of goods manufactured.
8. What was the cost of goods sold before adjusting for any under
or over applied overhead?
9. By how much was manufacturing overhead cost under or over
applied?
10. Would the summary journal entry to close any under or over
applied manufacturing overhead cost be a debit or credit to
COGS?
Question 1
Correct answer------------------(c) $60
Working
Salary of factory supervisor | $ 50,000.00 |
Heating and lighting costs for factory | $ 51,000.00 |
Depreciation on factory equipment | $ 19,000.00 |
Total estimated Overhead cost | $ 120,000.00 |
Divided by: Estimated machine hours | 2000 |
Predetermined overhead rate | $ 60.00 |