Question

1.Gwynnie Pie Company makes dessert pies for national fast food chains. Gwynnie Pie Company is considering...

1.Gwynnie Pie Company makes dessert pies for national fast food chains. Gwynnie Pie Company is considering using ABC costing and has the following activity cost pools and information​ available:

Activities

Estimated Overhead Costs

Estimated Activity

Material handling measured by batches

$251,000

2,000 batches

batches

Mixing measured by batches

$116,000

2,320

batches   

Packaging measured by units

$82,000   

4,100,000

units

Maintenance measured by​ # of setups

​$15,000

260 setups

Gwynnie Pie Company currently uses a plantwide overhead rate based on total estimated machine hours of​ 100,000 hours. Based on their estimates for ABC​ costing, what would the allocated cost for all overhead costs for Job 607 be based on the following information about the​ job:

​# of units in the job​ = 4,600

​# of units in each batch​ = 920

​# of setups required to complete the job​ = 1   

​# of machine hours​ = 220

A.$969.50

B$1,020.80

C.$1,027.19

D$ 325.19

2.

Flying High Manufacturing produces frisbees using a threeminus−step process that includes​ molding, coloring and finishing. Which account is credited when the frisbees are totally​ completed?

A.

Finished Goods Inventory

B.

WIP

Inventorylong dash—Finishing

C.

Manufacturing Overhead

D.

WIP

Inventorylong dash—Coloring

Homework Answers

Answer #1

Solution :

Answer (1) The Answer is (C) $ 1,027.19.

Answer (2) The Answer is (B) WIP Inventory — Finishing.

Working :

(1)

No. of Bathes in Job 607 = Total Units / No. of Units per Batch

= 4,600 / 920

= 5 Batches

Overhead Cost Allocation to Job 607 as per ABC Costing

Activity Working OH Allocated
Material Handeling ($ 251,000 / 2,000) * 5 $ 627.5
Mixing ($ 116,000 / 2,320) * 5 $ 250
Packaging ($ 82,000 / 4,100,000) * 4,600 $ 92
Maintenance ($ 15,000 / 260) * 1 $ 57.69
Total $ 1,027.19

(2)

At the time of transfer of finished goods from finishing department, following entry is to be passed :

Finished Goods xxx
WIP Inventory - Finishing xxx

Please vote up and write your doubts in comment section. Would be glad to help you further.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Lenoir Company manufactures two products—28,000 units of Product D and 12,000 units of Product R. The...
Lenoir Company manufactures two products—28,000 units of Product D and 12,000 units of Product R. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products D and R: Activity Cost Pool Activity Measure        Estimated Overhead Cost Expected Activity Machining. . . . ....
The Green Company makes boats from wood. Job 489 is to build 40 rowboats. Job 489...
The Green Company makes boats from wood. Job 489 is to build 40 rowboats. Job 489 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour.                                                                Total cost for all jobs        Total amount of activity for all jobs Type of manufacturing overhead      for the whole year                      for the whole year Setup Cost                                                        $50,000                                 400 setups Materials Handling                                         320,000                           16,000 moves Electricity                                                           30,000                             6,000 machine hours                                                                           _______ Total manufacturing...
Hickory Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...
Hickory Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labour-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool       Activity Measure        Estimated Overhead Cost      Expected Activity Machining             Machine-hours        $ 200,000                       10,000 MHs Machine setups Number...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
Foundational [LO4-1, LO4-2, LO4-3, LO4-4] Greenwood Company manufactures two products—14,000 units of Product Y and 6,000...
Foundational [LO4-1, LO4-2, LO4-3, LO4-4] Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining...
The Garden of Eden Company produces three products: Adam, Eve and Serpent. The company uses a...
The Garden of Eden Company produces three products: Adam, Eve and Serpent. The company uses a normal cost system and overhead costs are currently charged to products using a plant-wide overhead rate based on machine hours. Because of considerable differences in the support cost needs of each product, it is probably advisable that the company switch to an activity-based costing system to charge overhead to products. The company expects to produce 1,000 Adams, 3,400 Eves, and 600 Serpents in fiscal...
Hickory Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...
Hickory Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $732,100 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:    Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity   Machining Machine-hours $ 200,000   ...
4A. Harootunian Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based...
4A. Harootunian Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 80,000 Total fixed manufacturing overhead cost $ 312,000 Variable manufacturing overhead per machine-hour $ 2.10 Recently, Job T629 was completed with the following characteristics: Number of units in the job 50 Total machine-hours 200 The predetermined overhead rate is closest to: Multiple Choice $8.10 per...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool Base Budgeted Activity Budgeted Cost Machine set up # of setups 2710 $24804 Orders # of orders 991 $96484 Shipping Hours of shipping time 2233 $41621 In addition, prior to adopting an activity based costing system, Company Co. applied overhead based on direct labour hours. The budgeted total labour hours for the year was 54645. If one job required 424 direct labour hours, 39...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question