Question

Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the...

Two-Stage ABC for Manufacturing
Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year:

Activity cost pool Activity cost Activity cost driver
Machine setup $600,000 12,000 setup hours
Material handling 180,000 2,000 tons of materials
Machine operation 500,000 10,000 machine hours

The following data are for the production of single batches of two products, C23 Cams and U2 Shafts:

C23 Cams U2 Shafts
Units produced 500 200
Machine hours 5 5
Direct labor hours 400 500
Direct labor cost $5,000 $10,000
Direct materials cost $30,000 $20,000
Tons of materials 12.5 8
Setup hours 4 5

Determine the unit costs of C23 Cams and U2 Shafts using ABC.
C23 Cams $Answer


U2 Shafts $Answer

Homework Answers

Answer #1

Solution:

Computation of Activity rates
Cost Pool Cost assigned Total activity level Activity rate
Machine setup $6,00,000 12000 $50.00
Material handling $1,80,000 2000 $90.00
Machine operation $5,00,000 10000 $50.00
Computation of Overhead assigned to products
C23 Cams U2 Shafts
Activity cost pool Activity level used Activity rate Cost assigned Activity level used Activity rate Cost assigned
Machine setup 4 50.00 $200 5 50.00 $250
Material handling 12.5 90.00 $1,125 8 90.00 $720
Machine operation 5 50.00 $250 5 50.00 $250
Total Overhead cost assigned $1,575 $1,220
Computation of Unit costs
C23 Cams U2 Shafts
Direct Materials $30,000 $20,000
Direct labor $5,000 $10,000
Overhead Costs $1,575 $1,220
Total Costs $36,575 $31,220
/ Units produced 500 200
Unit cost $73.15 $156.10
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity cost pool Activity cost Activity cost driver Machine setup $600,000 12,000 setup hours Material handling 60,000 2,000 tons of materials Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts: C23 Cams U2 Shafts Units produced 500 100...
Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity...
Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity cost pools and cost driver levels for the latest period: Activity cost pool Activity cost Activity cost driver Machine setup $950,000 2,500 setup hours Material handling 520,000 5,000 material moves Machine operation 200,000 20,000 machine hours The following data are for the production of single batches of two products, Mirlite and Subdue: Mirlite Subdue Gallons produced 30,000 20,000 Direct labor hours 500 250 Machine...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information for its 2016 manufacturing activities: Budgeted Activity Cost Activity Cost Driver at Practical Capacity Purchasing and materials handling $675,000 900,000 kilograms Setup 700,000 1,120 setups Machine operations 954,000 12,000 hours First unit inspection 50,000 1,000 batches Packaging 250,000 312,500 units Actual 2016 production information is as follows: Standard Product A Standard Product B Specialty Products Units 150,000 100,000 50,000 Batches 100 80 600 Setups*...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers Maintenance $20,000 10,000 machine hours Material handling $25,000 250 moves Machine setup $30,000 1,000 hours Inspection $25,000 500 inspections Total $100,000 N/A The following information pertains to two representative jobs completed during January: Item Job 101 Job 102 Direct materials $10,000 $7,500 Direct labor $8,000 $5,000 Units produced 2,000 1,500 Direct labor hours 640 400 Machine hours 700 650 Number of material moves 40...
Wings Co. budgeted $569,000 manufacturing direct wages, 2,500 direct labor hours, and had the following manufacturing...
Wings Co. budgeted $569,000 manufacturing direct wages, 2,500 direct labor hours, and had the following manufacturing overhead: Overhead Cost Pool Budgeted Overhead Cost Budgeted Level for Cost Driver Overhead Cost Driver Materials handling $ 184,000 4,600 pounds Weight of materials Machine setup 15,900 530 setups Number of setups Machine repair 1,200 30,000 machine hours Machine hours Inspections 21,000 300 inspections Number of inspections Requirements for Job #971 which manufactured 4 units of product: Direct labor 20 hours Direct materials 190...
The company uses ABC and has determined the following activities, cost drivers and activity rates Activity...
The company uses ABC and has determined the following activities, cost drivers and activity rates Activity Center Activity Driver Activity rate Direct labor usage Direct labor hours $3 per DL hr Machine usage Machine hours $8 per machine hr Machine setups Setups $200 per set up Design changes Design changes $400 per design change You have completed Job 101. Determine the cost of Job 101, if the job required $1,000 in Direct Material, $3,000 in Direct Labor, 500 direct labor...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing...
After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 110,000 units of the Sport model and 45,000 units of the Pro model in the first...
Exercise 4-3 Compute ABC Product Costs [LO4-3] Larner Corporation is a diversified manufacturer of industrial goods....
Exercise 4-3 Compute ABC Product Costs [LO4-3] Larner Corporation is a diversified manufacturer of industrial goods. The company's activity-based costing system contains the following six activity cost pools and activity rates: Activity Cost Pool Activity Rates Labor-related $ 7.00 per direct labor-hour Machine-related $ 4.00 per machine-hour Machine setups $ 50.00 per setup Production orders $ 100.00 per order Shipments $ 150.00 per shipment General factory $ 4.00 per direct labor-hour    Cost and activity data have been supplied for...
Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its...
Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $636,400, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Assembly setups 132,000 Materials handling 64,800 Assembly 360,000 Maintenance 79,600 Total: 206,700 Cost Drivers Activity Level Setup hours 2,000 Number of moves 600 Assembly hours 18,000 Maintenance hours 1,990 Total direct labor hours used during the month were 14,800. Panasonic produces many different electronic products,...