Question

Which of the following is not a characteristic of the lean manufacturing philosophy? a push manufacturing...

Which of the following is not a characteristic of the lean manufacturing philosophy?

a push manufacturing (make to stock)
b product-oriented layout
c reducing setup time as a critical improvement priority
d short lead times

Homework Answers

Answer #1

Answer is option (a). push manufacturing (make to stock)

Explanation;

As we know that lean manufacturing philosophy refers to a systematic & managed manufacturing which helps in minimization of wastes and also helps in maximization of values.

Lean manufacturing philosophy helps in minimization of followings;

·        Inventory

·        Lead time

·        Setup time etc.

Thus on the basis of following explanation it is clear that option (a) os not a characteristic of the lean manufacturing philosophy.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The lean manufacturing philosophy views inventory as an unnecessary waste of resources. Group of answer choices...
The lean manufacturing philosophy views inventory as an unnecessary waste of resources. Group of answer choices True False Long setups and large batch sizes result in smaller inventories and reduced lead times. Group of answer choices True False In a push manufacturing system, production is based on estimated customer demand. Group of answer choices False True In a pull manufacturing system, production is based on estimated customer demand. Group of answer choices True False One inherent risk to using lean...
Which is NOT a benefit of lean manufacturing? a) increased productivity b) reduced lead times c)...
Which is NOT a benefit of lean manufacturing? a) increased productivity b) reduced lead times c) reduced direct labor costs d) reductions in inventory
A study by Agus and Hajinoor into the adoption of lean management among 200 (non-food) manufacturing...
A study by Agus and Hajinoor into the adoption of lean management among 200 (non-food) manufacturing companies in the Malay Peninsula identified that reducing setup times, shortening lead times and focusing on pull factors (such as maintaining production at levels commensurate to consumption) helped reduce costs and improve profitability. 1.What other strategies could be implemented along with lean production to improve quality and productivity? (i need a new answer please) Further information can be found in A. Agus and S....
When implementing a lean production system a stabilized schedule is achieved using which of the following?...
When implementing a lean production system a stabilized schedule is achieved using which of the following? Level scheduling Demand pull Freeze window Reduced lot sizes Bottom-round management In implementing a lean production system you should work with suppliers to do which of the following? Open facilities near your factory Focus workstation capacities Backflush Provide quality at the source Reduce lead times In implementing a lean production system you should work with suppliers to do which of the following? Calculate lead...
Which of the following was not a characteristic of the Marks & Spencer supply chain prior...
Which of the following was not a characteristic of the Marks & Spencer supply chain prior to the late 1990s? a) Used many local suppliers b) Focused on low cost c) Used suppliers to innovate products d) Experienced long lead times
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 57 units. The process time for each step is as follows: Process Step 1 9 minutes Process Step 2 8 minutes Process Step 3 5 minutes Process Step 4 4 minutes The time required to move each batch between steps is 15 minutes. In addition, the time to move raw materials to Process Step...
1.For which of the following products would a large manufacturer most likely use a push strategy?...
1.For which of the following products would a large manufacturer most likely use a push strategy? a. breakfast cereals b. minicomputers c. dishwashing detergent d. women's hosiery 2.In which stage of the product life cycle would pioneering advertising be most likely to appear? a. growth b. maturity c. culmination d. introductory e. decline 3The ______ of an ad is defined as all the written or spoken material in it. a. layout b. copy c. feedback d. message
A manufacturing company produces two products, which has the following information: Characteristic Product 1 Product 2...
A manufacturing company produces two products, which has the following information: Characteristic Product 1 Product 2 Profit/unit $4 $2 Dept. A hours/unit 1 1 Dept. B hours/unit 2 4 Last month’s production schedule used 400 hours of labor in department A and 950 hours of labor in department B. The management has been experiencing problems during the past six months because of variable monthly department workload amounts. Management would like to develop a production schedule for the coming month that...
Which of the following is not a principle for reducing setup times? A. converting external setup...
Which of the following is not a principle for reducing setup times? A. converting external setup to internal setup B. converting internal setup to external setup C. separating internal setup from external setup D. performing setup activities in parallel
13. What is "Lean Manufacturing"? a) A metal product used in the electronics industry b) A...
13. What is "Lean Manufacturing"? a) A metal product used in the electronics industry b) A way for companies to rid of much waste that adds no value to production c) The preferred vendor to a company d) A holiday 14. In project management, the scheduling function: a. is probably the major tool for the management of projects. b. is so important that a detailed schedule is sometimes a customer-specified requirement. c. can serve as a key input in the...