Sana Rosa Company manufactures unfinished home furniture. Sana Rosa uses a standard cost system. The direct labor, direct materials, and factory overhead standards for an unfinished dining room table are as follows:
Direct labor: | standard rate | $22.00 per hr. |
standard time per unit | 2 hrs. | |
Direct materials (oak): | standard price | $9.50 per bd. ft. |
standard quantity | 18 bd. ft. | |
Variable factory overhead: | standard rate | $2.80 per direct labor hr. |
Fixed factory overhead: | standard rate | $1.20 per direct labor hr. |
a. Determine the standard cost per dining room
table. If required, round your answer to two decimal places.
$per table
b. A standard cost system provides Sana Rosa management a cost control tool using the principle of . Using this principle, cost deviations from standards can be investigated and corrected.
a) Calculation of standard cost per dinning room table | ||||
Particulars | Amount | |||
Direct labour per unit ($22*2hr) | $ 44.00 | |||
Direct material per unit ($9.50*18) | $ 171.00 | |||
Variable factory overhead per unit (2.80*2hr) | $ 5.60 | |||
Fixed manufacturing overhead per unit ($1.20*2hr) | $ 2.40 | |||
Standard cost per dinning room table | $ 223.00 | |||
b) A standard cost system provides Rosa management a cost | ||||
control tool using the principle of cost control using this | ||||
principle, Major cost deviations from standard can be | ||||
investigated and corrected |