Question

Lead Time Analysis Furry Friends Inc. manufactures toy stuffed animals. The direct labor time required to...

Lead Time Analysis

Furry Friends Inc. manufactures toy stuffed animals. The direct labor time required to cut, sew, and stuff a toy is 10 minutes per unit. The company makes two types of stuffed toys—a lion and a bear. The lion is assembled in lot sizes of 50 units per batch, while the bear is assembled in lot sizes of 8 units per batch. Since each product has direct labor time of 10 minutes per unit, management has determined that the lead time for each product is 10 minutes.

a. Lead time includes ___, ___, and ___.

  1. Value-added time, wait time and other non-value-added time.
  2. Production time, packing time and value-added time.
  3. Idle time, direct labor hours, and wait time.
  4. None of the above.

b. A toy manufacturing unit produces two types of products and the labor time for the each product is 10 minutes. The batch size of product A is 50 units and batch size of product B is 8 units. The company considers the lead time of the products is equal to the labor hour’s. Is the decision correct and supports your answer by selecting the reason.

  1. Yes
  2. No

Reason:

  1. Lead time of the product includes value-added time, idle time and other non-value-added time.
  2. Labor time and lead time adds value to the product.
  3. Lead time and labor time are one and the same with different names.
  4. None of the above.

Homework Answers

Answer #1

Lead Time: Lead is the time period between the recipt of the an order till its dispatch, that is initiation of a process till the completion.

a  

Lead time includes ___, ___, and ___.

  1. Value-added time, wait time and other non-value-added time.

b.

No. - Direct Labor is a part of lead time and not the lead time.

Reason:

  1. Lead time of the product includes value-added time, idle time and other non-value-added time.

Hope this helps! In case of any clarifications, kindly use the comment box below

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Palm Pals Inc. manufactures toy stuffed animals. The direct labor time required to cut, sew, and...
Palm Pals Inc. manufactures toy stuffed animals. The direct labor time required to cut, sew, and stuff a toy is 12 minutes per unit. The company makes two types of stuffed toys—a lion and a bear. The lion is assembled in lot sizes of 40 units per batch, while the bear is assembled in lot sizes of 5 units per batch. Since each product has direct labor time of 12 minutes per unit, management has determined that the lead time...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes a printed circuit...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes a printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is...
Lead Time Audio Max Electronics Company manufactures electronic stereo equipment. The manufacturing process includes printed circuit...
Lead Time Audio Max Electronics Company manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of assembly time. After each batch is completed,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Calculate Lead Time Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing...
Calculate Lead Time Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 74 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 9 minutes Process Step 4 4 minutes The time required to move each batch between steps is 17 minutes. In addition, the time to move raw materials...
home / study / business / accounting / accounting questions and answers / sound tek inc....
home / study / business / accounting / accounting questions and answers / sound tek inc. manufactures electronic stereo equipment. the manufacturing process includes ... Question: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes print... Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 85 parts. A part requires 2 minutes in milling and 8 minutes in finishing. The move time between the two operations for a complete batch is 9 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 85 parts. A part requires 3 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and...