Question

Tombro Industries is in the process of automating one of its plants and developing a flexible...

Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control measures: Number of defects 200 178 139 97 Number of warranty claims 61 54 45 42 Number of customer complaints 117 111 94 73 Material control measures: Purchase order lead time 8 days 7 days 5 days 4 days Scrap as a percent of total cost 1 % 1 % 2 % 3 % Machine performance measures: Machine downtime as a percentage of availability 4 % 5 % 5 % 8 % Use as a percentage of availability 94 % 91 % 88 % 84 % Setup time (hours) 8 10 11 12 Delivery performance measures: Throughput time ? ? ? ? Manufacturing cycle efficiency (MCE) ? ? ? ? Delivery cycle time ? ? ? ? Percentage of on-time deliveries 95 % 94 % 91 % 88 % The president has read in industry journals that throughput time, MCE, and delivery cycle time are important measures of performance, but no one is sure how they are computed. You have been asked to assist the company, and you have gathered the following data relating to these measures: Average per Month (in days) 1 2 3 4 Wait time per order before start of production 10.0 12.0 13.0 15.0 Inspection time per unit 0.7 0.6 0.6 0.6 Process time per unit 2.8 2.7 2.6 1.1 Queue time per unit 4.1 5.1 6.2 8.6 Move time per unit 0.4 0.6 0.6 0.7 Required: 1-a. Compute the throughput time for each month. (Round your answers to 1 decimal place.) 1-b. Compute the manufacturing cycle efficiency (MCE) for each month. (Round your answers to 1 decimal place.) 1-c. Compute the delivery cycle time for each month. (Round your answers to 1 decimal place.) 3-a. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 5 the inspection time, process time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production. Compute the new throughput time and MCE. (Round your answers to 1 decimal place.) 3-b. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 6 the inspection time, process time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during production and the inspection time using Lean Production. Compute the new throughput time and MCE.. (Round your answers to 1 decimal place.)

Homework Answers

Answer #1

SOLUTION

1a.

Month 1 Month 3 Month 3 Month 4
Process time 2.8 2.7 2.6 1.1
Queue time 4.1 5.1 6.2 8.6
Move time 0.4 0.6 0.6 0.7
Inspection time 0.7 0.6 0.6 0.6
Throughput time 8.0 9.0 10.0 11.0

1b.

Month 1 Month 3 Month 3 Month 4
Process time (a) 2.8 2.7 2.6 1.1
Throughput time (b) 8.0 9.0 10.0 11.0
MCE (a/b) 35% 30% 26% 10%

1c.

Month 1 Month 3 Month 3 Month 4
Wait time (a) 10.0 12.0 13.0 15.0
Throughput time (b) 8.0 9.0 10.0 11.0
Delivery cycle time (a+b) 18.0 21.0 23.0 26.0

3a.

Month 5
Process time 1.1
Queue time 0
Move time 0.7
Inspection time 0.6
Throughput time 2.4

MCE = 1.1 / 2.4 = 45.8%

3b.

Month 6
Process time 1.1
Queue time 0
Move time 0.7
Inspection time 0
Throughput time 1.8

MCE = 1.1 / 1.8 = 61.1%

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months:    Month 1 2 3 4 Quality...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...
In an effort to evaluate performance and determine where improvements can be made, management has gathered...
In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control measures: Number of defects 201 179 140 98 Number of warranty claims 62 55 46 43 Number of customer complaints 118 112 95 74 Material control measures: Purchase order lead time 10 days 9 days 7 days 5 days Scrap as a percent of total cost...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible...
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...