Question

Wagner Ltd provides a repair and maintenance service for commercial computer networks. A repair for a...

Wagner Ltd provides a repair and maintenance service for commercial computer networks. A repair for a particular network required direct materials costing pound 3740. Direct labour worked on the repair was 18 hours and the wage rate for labour is pound 27.00an hour. The business incurs overheads of pound 118000 each month. During each month 4 500 direct labour hours are worked and charged to cost units​ (jobs carried out by the​ business). The business charges overheads to jobs on a direct labour hour basis.

What is the full​ (absorption) cost of the​ job?

Homework Answers

Answer #1

Overhead cost per hour = Total Overheads per month/Total labor hours per month

= 118,000/4,500 hrs = 26.22 per hour

Calculation of Full (absorption) cost of the job (Amounts in )

Direct materials cost 3,740
Direct labor cost (18 hrs*27 per hour) 486
Overhead Charged (18 hrs*26.22 per hour) 472
Total full cost of the job 4,698

Therefore the total full cost of the job is 4,698.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Golden Heaven Ltd. Manufactures custom kitchen cabinets and uses a job costing system. On January 1,...
Golden Heaven Ltd. Manufactures custom kitchen cabinets and uses a job costing system. On January 1, 2015, there were no balances in work-in-process or finished goods inventories. The following events occurred in January 2015: 1. The company began two jobs: Job CC456 (comprising 40 tables) and Job DD789 (comprising 60 chairs). 2. 400 square metres of timber were purchased at a total cost of $5,800. 3. 80 litres of glue were purchased at a cost of $6 per litre. 4....
1. Johnson Filtration, Inc., provides maintenance service for water-filtration systems throughout southern Florida. Customers contact Johnson...
1. Johnson Filtration, Inc., provides maintenance service for water-filtration systems throughout southern Florida. Customers contact Johnson with requests for maintenance service on their water-filtration systems. To estimate the service time and the service cost, Johnson’s managers want to predict the repair time necessary for each maintenance request. Management collected data over the last 10 service calls, and ran a multiple regression analysis on this sample. As a result, they developed the following estimated regression equation to predict y = the...
Floyd’s Auto Repair Shop uses a job order cost system to track the cost of each...
Floyd’s Auto Repair Shop uses a job order cost system to track the cost of each repair. Floyd’s applies its garage or shop overhead at a rate of $20 per direct labor hour spent on each repair. Floyd’s uses the following accounts to track the cost of all repairs: Raw Materials (parts and supplies) Repair Jobs in Process Cost of Repairs Completed and Sold Garage/Shop* Overhead Costs * Because an auto shop does not manufacture a product, the overhead cost...
Perfect Paints Ltd manufactures decorative paint at its factory in Wadeville, Johannesburg. Two basic product ranges...
Perfect Paints Ltd manufactures decorative paint at its factory in Wadeville, Johannesburg. Two basic product ranges are manufactured, namely the ProTouch and BestGuard ranges. Paint is sold in 20 litre containers to hardware stores and paint shops. Perfect Paints also distributes the paint directly to building contractors and property developers at the same price as it sells to the shops. Perfect Paints Ltd has one production line and as a result the paint is manufactured in batches. Standard production batches...
You are cost manager at Pristine Ltd which is the region’s largest manufacturer of commercial and...
You are cost manager at Pristine Ltd which is the region’s largest manufacturer of commercial and residential elegant cabinets and wood works. Due to the competitive market and technological advancements in almost every area of the business, the board of directors from the input of division’s head and other senior management, has decided to shift from traditional costing techniques to activity based costing in order to arrive at more accurate cost per unit especially for the cabinets which is the...
Bell Franco Ltd. is currently using plantwide (blanket) overhead rate based on the machine hours of...
Bell Franco Ltd. is currently using plantwide (blanket) overhead rate based on the machine hours of 250,000 hours to calculate its absorption rate of manufacturing overheads. The table 1 presents annual overhead costs of Bell Franco Ltd: Description £ Rent, heating and lighting of factory 400,000 Factory Insurance 200,000 Salary of factory manager and supervisor 100,000 Depreciation of factory machinery 250,000 Cleaning expenses[1] 75,000 Administrative overheads[2] 125,000 Selling overheads[3] 350,000 Table 1: Overhead costs Due to recent expansion and competitive...
1. Management accounting is said to meet. Select one: A. The internal accounting needs of the...
1. Management accounting is said to meet. Select one: A. The internal accounting needs of the organisation B. The external accounting needs of the organization C. The regulatory requirements of the organisation D. The needs of laws that govern company financial reporting 2. Which of the following defines total product cost? Select one: A. Direct costs plus indirect costs of production, selling and administration B. A prime cost plus production overhead C. Indirect cost plus production overhead D. Prime cost...
Hellier Contractors paints interiors of residences and commercial structures. The firm's management has established cost standards...
Hellier Contractors paints interiors of residences and commercial structures. The firm's management has established cost standards per 100 square feet of area to be painted. Direct material ($18 per gallon of paint) $1.50    Direct labor 2.00 Variable overhead 0.60 Fixed overhead (based on 600,000 square feet per month) 1.25 Management has determined that 400 square feet can be painted by the average worker each hour. During May, the company painted 600,000 square feet of space and incurred the following costs:...
[The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress...
[The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q. Job P was completed and sold by the end of March and Job Q was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labor-hours. The following additional information is available for the company as a...
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q. Job P was completed and sold by the end of March and Job Q was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labor-hours. The following additional information is available for the company as a whole and for Jobs P and Q (all data...