Question

In this exercise, processing and total time are measured in hours. As a result, your calculated...

In this exercise, processing and total time are measured in hours. As a result, your calculated throughput will produce the number of units/cars produced through the plant's production system per hour.

Rules:

* The plant runs two 8 hour shifts, 5 days per week. Total time is 80 hours.

* Due to maintenance and downtime, the plant's "processing time" comes in lower than "total time" available.

* Calculate and round Productive Processing Time and Yield to 2 decimal places. e.g.,    .83    .91 .67

* Round Productive Capacity and Throughput calculations to whole numbers. e.g.,   8.25 would be 8.    14.78 would be 15.

As the plant's accountant, you are responsible for calculating and commenting on the plant's throughput. The figures for your analysis are:

Processing Time 73
Total time 80
Good units 2,700
Total units produced 2,905

Based on your calculations:

Throughput is calculated to be ___________ cars per hour.

Productive Capacity is calculated to be .___________

Productive Processing Time is calculated to be ._____________

Yield is calculated to be ._________________

Between the two factors -- Productive Processing Time and Yield --- the lowest factor is (enter "Productive Processing Time" or "Yield") __________ and needs to be improved.

Homework Answers

Answer #1

Here is my Answer for the above question

1. Calculation of Throughput per hour

Throughput = Inventory of good units(salable units)/ time for that units

Throughput = 2700/73=37 units per hour

2. Calculation of Productive capacity

Productive capacity=Total machine hours capacity/ time required for production of one unit of product

Production capacity= 80/0.02753=2905 (assumed here plant working with 100% capacity)

3.Productive processing time

it is 73/80*100= 91.25%

4.Calculation of yield

Actual yield (salable goods)/ expected total products: 2700/2905*100=92.94%

5. in the above two factors productive processing should be improved

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The following information is known for a given system: 1. The total System Operating time for...
The following information is known for a given system: 1. The total System Operating time for a designated period is 10,000 hours 2. The corrective maintenance rate is .004 maintenance action per hour of system operation 3. The perventive maintenance rate is .001 maintenance action per hour of system operation 4. The average downtime per maintenance action is 50 hours with a mean downtime of 5 hours for corrective maintenance a. Calculate the following: MTBF, MTBM, Ai, Ao? b. What...
Exercise 25-3 Your answer is incorrect. Try again. Stefani Company has gathered the following information about...
Exercise 25-3 Your answer is incorrect. Try again. Stefani Company has gathered the following information about its product. Direct materials: Each unit of product contains 4.40 pounds of materials. The average waste and spoilage per unit produced under normal conditions is 0.70 pounds. Materials cost $ 2 per pound, but Stefani always takes the 3.00 % cash discount all of its suppliers offer. Freight costs average $ 0.35 per pound. Direct labor. Each unit requires 1.30 hours of labor. Setup,...
Your answer is incorrect. Try again. Stefani Company has gathered the following information about its product....
Your answer is incorrect. Try again. Stefani Company has gathered the following information about its product. Direct materials: Each unit of product contains 4.40 pounds of materials. The average waste and spoilage per unit produced under normal conditions is 0.70 pounds. Materials cost $ 2 per pound, but Stefani always takes the 3.00 % cash discount all of its suppliers offer. Freight costs average $ 0.35 per pound. Direct labor. Each unit requires 1.30 hours of labor. Setup, cleanup, and...
The manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and...
The manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 25 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: Interviewing: 65 minutes. Hiring: 80 minutes. Assessment: 115...
Exercise 4-8 Computing ABC Product Costs [LO4-2, LO4-3] [The following information applies to the questions displayed...
Exercise 4-8 Computing ABC Product Costs [LO4-2, LO4-3] [The following information applies to the questions displayed below.] Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow:     Direct Labor-Hours per unit Annual Production Rims 0.70 26,000 units Posts 0.70 90,000 units Additional information about the company follows: Rims require $14 in direct materials per unit, and Posts require $10. The direct labor wage rate is $18 per hour. Rims are more complex to...
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories....
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments—Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March): Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing...
Required information [The following information applies to the questions displayed below.] Sweeten Company had no jobs...
Required information [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments--Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March): Molding Fabrication Total...
Required information [The following information applies to the questions displayed below.] Sweeten Company had no jobs...
Required information [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments—Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March): Molding Fabrication Total...
Woodruff Company is currently producing a snowmobile that uses five specialized parts. Engineering has proposed replacing...
Woodruff Company is currently producing a snowmobile that uses five specialized parts. Engineering has proposed replacing these specialized parts with commodity parts, which will cost less and can be purchased in larger order quantities. Current activity capacity and demand (with specialized parts required) and expected activity demand (with only commodity parts required) are provided. Activities Activity Driver Activity Capacity Current Activity Demand Expected Activity Demand Material usage Number of parts 220,000 220,000 220,000 Installing parts Direct labor hours 32,000 32,000...
Exploiting Internal Linkages Woodruff Company is currently producing a snowmobile that uses five specialized parts. Engineering...
Exploiting Internal Linkages Woodruff Company is currently producing a snowmobile that uses five specialized parts. Engineering has proposed replacing these specialized parts with commodity parts, which will cost less and can be purchased in larger order quantities. Current activity capacity and demand (with specialized parts required) and expected activity demand (with only commodity parts required) are provided. Activites Activity Driver Activity Capacity Current Activity Demand Expected Activity Demand Material usage Number of parts 100,000 100,000 100,000 Installing parts Direct labor...