Exercise 4-8 Computing ABC Product Costs [LO4-2, LO4-3]
[The following information applies to the questions displayed below.]
Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow:
Direct Labor-Hours per unit |
Annual Production |
|
Rims | 0.70 | 26,000 units |
Posts | 0.70 | 90,000 units |
Additional information about the company follows:
Rims require $14 in direct materials per unit, and Posts require $10.
The direct labor wage rate is $18 per hour.
Rims are more complex to manufacture than Posts and they require special equipment.
The ABC system has the following activity cost pools:
Estimated Activity | ||||||
Activity Cost Pool | Activity Measure |
Estimated Overhead Cost |
Rims | Posts | Total | |
Machine setups | Number of setups | $ | 42,300 | 120 | 80 | 200 |
Special processing | Machine-hours | $ | 162,000 | 4,000 | 0 | 4,000 |
General factory | Direct labor-hours | $ | 936,000 | 4,000 | 48,000 | 52,000 |
Exercise 4-8 Part 1
Required:
1. Compute the activity rate for each activity cost pool. (Round your answers to 2 decimal places.)
Exercise 4-8 Part 2
2. Determine the unit product cost of each product according to the ABC system. (Do not round intermediate calculations. Round your final answers to 2 decimal places.)
1 | |||
Activity Cost Pool | Activity rate | ||
Machine setups | 211.50 | per setup | =42300/200 |
Special processing | 40.50 | per Machine-hour | =162000/4000 |
General factory | 18.00 | per Direct labor-hour | =936000/52000 |
2 | |||
Rims | Posts | ||
Machine setups | 25380 | 16920 | |
Special processing | 162000 | 0 | |
General factory | 72000 | 864000 | |
Total overhead | 259380 | 880920 | |
Divided by units | 26000 | 90000 | |
Overhead per unit | 9.98 | 9.79 | |
Rims | Posts | ||
Direct materials per unit | 14.00 | 10.00 | |
Direct labor per unit | 12.60 | 12.60 | |
Overhead per unit | 9.98 | 9.79 | |
Unit product cost | 36.58 | 32.39 | |