Ready Ride is a trucking company. It provides local, short-haul,
and long-haul services. It has developed the following three cost
pools.
Activity Cost Pool |
Cost Drivers |
Estimated Overhead |
Estimated Use of |
|||
Loading and unloading | Number of pieces | $85,785 | 90,300 | |||
Travel | Miles driven | 468,000 | 585,000 | |||
Logistics | Hours | 65,520 | 3,120 |
Compute the activity-based overhead rates for each pool. (Round answers to 2 decimal places, e.g. 12.75.)
Activity Cost Pool |
Activity-Based |
||
Loading and unloading | $ | per piece | |
Travel | $ | per mile | |
Logistics | $ | per hour |
Determine the overhead allocated to Job XZ3275 which has 150 pieces, requires 200 miles of driving, and 0.75 hours of logistics. (Round answer to 2 decimal places, e.g. 12.75.)
Overhead applied to job XZ3275 | $Type your answer here |
Answer: $318.25
Calculations:
Activity Cost Pool |
Estimated Overhead |
Estimated Use of Cost driver per activity |
= |
Activity Rate |
|||
/ | |||||||
Loading and unloading | $85,785 | / | 90300 | Number of pieces | = | $0.95 | per piece |
Travel | $468,000 | / | 585000 | Miles driven | = | $0.80 | per mile |
Logistics | $65,520 | / | 3120 | Hours | = | $21.00 | per hour |
.
Cost driver | x | Activity Rate | = | Overhead allocated | |
Loading and unloading | 150 | x | $0.95 | = | $142.50 |
Travel | 200 | x | $0.80 | = | $160.00 |
Logistics | 0.75 | x | $21.00 | = | $15.75 |
Overhead applied to Job XZ3275 | $318.25 |
Get Answers For Free
Most questions answered within 1 hours.