Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 39%. When last calculated, Waymouth’s MCE was 34%.
Key measures from the recent month’s production, averaged over all the jobs during that period, are as follows:
Activity | Average Time (hours) | ||
New product development | 28.0 | ||
Materials handling | 1.5 | ||
Order setup | 5.5 | ||
Machine maintenance | 2.5 | ||
Order scheduling | 2.0 | ||
Inspection of completed order | 4.5 | ||
Pack and move to storage or ship | 1.5 | ||
Manufacturing assembly | 22.0 | ||
Order taking and checking | 2.5 | ||
Receiving and stocking raw materials | 5.5 | ||
Inspection of raw materials at start of production | 1.5 | ||
Required:
Determine the manufacturing cycle efficiency (MCE) for the recent month. (Round your answer to 1 decimal place.)
Manufacturing cycle efficiency (MCE) = Total processing time/Total cycle time | ||
Manufacturing cycle efficiency (MCE) = 22/46.5= 47.3% | ||
Workings: | ||
Total processing time=Manufacturing assembly = 22.0 | ||
Cycle time: | ||
Materials handling | 1.5 | |
Order setup | 5.5 | |
Machine maintenance | 2.5 | |
Order scheduling | 2.0 | |
Inspection of completed order | 4.5 | |
Pack and move to storage or ship | 1.5 | |
Manufacturing assembly | 22.0 | |
Receiving and stocking raw materials | 5.5 | |
Inspection of raw materials at start of production | 1.5 | |
Total Cycle time | 46.5 | |