Question

The Electric Company produces generators and alternators for industrial purposes. Each generator requires 3 hours of...

The Electric Company produces generators and alternators for industrial purposes. Each generator requires 3 hours of wiring and 2 hours of testing. Each alternator requires 2 hours of wiring and 4 hours of testing. There are 18 hours of wiring time and 20 hours of testing time available. Generators earn $15 of profit per unit and alternators earn $20 of profit per unit. What is the objective function?

Homework Answers

Answer #1

Objective function

Maximize

Z = 15x + 20y

In Linear programming objective function is either to miximize the profit or to minimize the cost , as the given question is for profit and it is maximization of profit

Let the unit of Generator be X and unit of alternators be y

Hence Obejctive function

Maximize

Z = 15x + 20y

Subject to constraint

3x+2y 18...... .(Wiring hours Constraint)

2x+4y 20..... .(Testing hour Contraint )

Where x, y 0

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The ElectroTech Engineering manufactures two industrial sized electrical devices: generators and alternators. Both of these products...
The ElectroTech Engineering manufactures two industrial sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 5 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the...
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require...
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next...
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours...
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective is...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly,...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly, one hour of painting and $50 of inventory, Each unit of product 2 requires one hour of assembly, three hours of painting and $75 of inventory, Each unit of product 3 requires 2.5 hours of assembly, 2.5 hours of painting and $20 of inventory, Each unit of product 4 requires 5 hours of assembly no painting and $100 of inventory. The firm has 140...
. Jones Furniture Company produces beds and desks for college students. The production process requires carpentry...
. Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited so at most 8 will be produced. After...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1/2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $94 per unit and the profit on the economy model...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1 2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $90 per unit and the profit on the economy...
Abernathy, Inc., produces two different generators and is concerned about their quality. The company has identified...
Abernathy, Inc., produces two different generators and is concerned about their quality. The company has identified the following quality activities and costs associated with the two products: Generator A Generator B Units produced 166,900 347,500 Warranty work (units) 1,730 840 Scrapped units (number) 3,460 860 Inspection (hours) 3,370 1,700 Quality training (hours) 88 88 Activities: Performing warranty work $824,970 Scrapping units 622,080 Inspecting 288,990 Quality training 87,472 1. Calculate the quality cost per unit for each product, and break this...
A small company produces three computer components. Component A requires 2 hours of fabrication and one...
A small company produces three computer components. Component A requires 2 hours of fabrication and one hour of assembly, Component B requires 3 hours of fabrication and one hour of assembly, and Component C requires 2 hours of fabrication and 2 hours of assembly. The company has 1000 hours of fabrication and 800 hours of assembly available every week. Profit of Components A, B, and C are $7, $8, and $10 respectively. Using the simplex method, calculate how many components...
A manufacturer produces two products, P and Q, which when sold earn contributions of  £600 and  £400 per...
A manufacturer produces two products, P and Q, which when sold earn contributions of  £600 and  £400 per unit respectively.  The manufacturer of each product requires time on a lathe and a polishing machine. Each unit of P requires 2 hours on the lathe and 1 hour on the polishing machine, while Q requires 1 hour on each machine.  Each day, 10 hours are available on the lathe and 7 hours on the polishing machine.  Determine the number of units of P and Q that...