Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below:
Alternative Q |
Alternative R |
||||||
Supplies costs |
$ |
65,000 |
$ |
65,000 |
|||
Power costs |
$ |
30,000 |
$ |
29,000 |
|||
Inspection costs |
$ |
18,000 |
$ |
29,000 |
|||
Assembly costs |
$ |
33,000 |
$ |
33,000 |
a. Which costs are relevant and which are not relevant in the choice between these two alternatives?
b. What is the differential cost between the two alternatives?