Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments--Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March):
Molding | Fabrication | Total | |||||||
Estimated total machine-hours used | 2,500 | 1,500 | 4,000 | ||||||
Estimated total fixed manufacturing overhead | $ | 14,250 | $ | 17,550 | $ | 31,800 | |||
Estimated variable manufacturing overhead per machine-hour | $ | 3.10 | $ | 3.90 | |||||
Job P | Job Q | |||||
Direct materials | $ | 30,000 | $ | 16,500 | ||
Direct labor cost | $ | 34,600 | $ | 14,300 | ||
Actual machine-hours used: | ||||||
Molding | 3,400 | 2,500 | ||||
Fabrication | 2,300 | 2,600 | ||||
Total | 5,700 | 5,100 | ||||
Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.
Required:
For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments.
14. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for Job P and 30 units were produced for Job Q? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
15. What was Sweeten Company’s cost of goods sold for March? (Do not round intermediate calculations.)
Molding overhead rate = 14250/2500+3.1 = 8.80 per hour
Fabrication overhead rate = 17550/1500+3.9 = 15.60 per hour
14) Calculate selling price
Job P | Job Q | |
Direct material | 30000 | 16500 |
Direct labor | 34600 | 14300 |
Molding overhead | 3400*8.8 = 29920 | 22000 |
Fabrication overhead | 2300*15.60 = 35880 | 40560 |
Total manufacturing cost | 130400 | 93360 |
Markup | 104320 | 74688 |
Selling price | 234720 | 168048 |
Unit | 20 | 30 |
Selling price per unit | 11736 | 5602 |
15) Cost of goods sold = 130400+93360 = 223760
Get Answers For Free
Most questions answered within 1 hours.