Question

Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...

Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete.

The final assembly for each stereo unit requires 19 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The units wait while the setup is performed. In the final test, the 50-unit batch is tested one at a time. Each test requires 9 minutes. The completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 50 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and labeling requires 7 minutes per unit.

1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 50 units. Categorize the non-value-added time into wait and move time. Round the percentage to one decimal place.

Value-added lead time min.
Non-value-added lead time:
Wait time lead time min.
Move time lead time min.
Total non-value-added lead time min.
Total lead time min.
Value-added ratio (as a percent) %

Homework Answers

Answer #1
Minutes Minutes
Value-added lead time 39 a
Non-value-added lead time:
Wait time lead time 1941 b
Move time lead time (9+20) 29 c
Total non-value-added lead time 1970 d=b+c
Total lead time 2009 e=a+d
Value-added ratio (as a percent) 1.9% f=(a/e) x 100 %
a Value-added lead time
Particulars Minutes
PC board assembly 4
Final assembly 19
Testing 9
Packaging and labeling 7
Total Value added time 39
b Wait time lead time
Particulars Minutes
Wait time for Non added value 1,911
[value added time x (batch size -1)]
[ 39 x (50-1)]
Add: Test set-up time 30
Wait time 1,941
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes a printed circuit...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes a printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is...
Lead Time Audio Max Electronics Company manufactures electronic stereo equipment. The manufacturing process includes printed circuit...
Lead Time Audio Max Electronics Company manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of assembly time. After each batch is completed,...
home / study / business / accounting / accounting questions and answers / sound tek inc....
home / study / business / accounting / accounting questions and answers / sound tek inc. manufactures electronic stereo equipment. the manufacturing process includes ... Question: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes print... Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each...
Calculate Lead Time Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing...
Calculate Lead Time Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 74 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 9 minutes Process Step 4 4 minutes The time required to move each batch between steps is 17 minutes. In addition, the time to move raw materials...
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 57 units. The process time for each step is as follows: Process Step 1 9 minutes Process Step 2 8 minutes Process Step 3 5 minutes Process Step 4 4 minutes The time required to move each batch between steps is 15 minutes. In addition, the time to move raw materials to Process Step...
Lead Time Analysis Furry Friends Inc. manufactures toy stuffed animals. The direct labor time required to...
Lead Time Analysis Furry Friends Inc. manufactures toy stuffed animals. The direct labor time required to cut, sew, and stuff a toy is 10 minutes per unit. The company makes two types of stuffed toys—a lion and a bear. The lion is assembled in lot sizes of 50 units per batch, while the bear is assembled in lot sizes of 8 units per batch. Since each product has direct labor time of 10 minutes per unit, management has determined that...
MANAGERIAL ACCOUNTING Q1: The Klamath Corp. produces two products, saws and drills. Three activities are used...
MANAGERIAL ACCOUNTING Q1: The Klamath Corp. produces two products, saws and drills. Three activities are used in their manufacture. These activities and their associated costs and bases are as follows: Activity Budgeted Costs Activity Base Stamping $200,000 Machine hours Assembly $400,000 Labor hours Setup $30,000 Number of setups Activity Base Saws Drills Total Machine hours 4,000 6,000 10,000 Labor hours 7,000 13,000 20,000 Number of setups        3        12        15 Units produced     500     600 a. Determine the activity rate for each...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT