Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing...

Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing departments: Fabrication and Assembly. Bunker also has an Inspection Department that is responsible for testing monitors to ensure that they perform within prespecified tolerance ranges (a sampling procedure is used). Budgeted data for the three departments are as follows:

Inspection Fabrication Assembly
Overhead $400,000 $600,000    $170,000  
Number of tests 25,000    75,000  
Direct labor hours 60,000    30,000  

In the Fabrication Department, the basic model requires 1.1 hour(s) of direct labor and the advanced model requires 2.2 hour(s). In the Assembly Department, the basic model requires 1.3 hour(s) of direct labor and the advanced model requires 2.45 hours. There are 37,500 basic units produced and 20,000 advanced units.

Immediately after preparing the budgeted data, a consultant suggests that two manufacturing cells be created: one for the manufacture of the basic model and the other for the manufacture of the advanced model. Raw materials would be delivered to each cell, and goods would be shipped immediately to customers upon completion. Workers within each cell would also be trained to perform monitor testing. The total direct overhead costs estimated for each cell would be $190,000 for the basic cell and $600,000 for the advanced cell.

Required:

1. Allocate the inspection costs to each department.

Fabrication $
Assembly $

Compute the overhead cost per unit for each monitor. Overhead rates use direct labor hours. Round your intermediate calculations and final answers to the nearest cent.

Basic $ per unit
Advanced $ per unit

2. Compute the overhead cost per unit if manufacturing cells are created. If required, round your intermediate calculations and final answers to the nearest cent.

Basic $ per unit
Advanced $ per unit

Which unit overhead cost do you think is more accurate—the one computed with a departmental structure, or the one computed using a cell structure?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Cost Assignment and JIT Bunker Company produces two types of glucose monitors (basic and advanced). Both...
Cost Assignment and JIT Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing departments: Fabrication and Assembly. Bunker also has an Inspection Department that is responsible for testing monitors to ensure that they perform within prespecified tolerance ranges (a sampling procedure is used). Budgeted data for the three departments are as follows: Inspection Fabrication Assembly Overhead $160,000 $240,000    $68,000   Number of tests — 10,000    30,000   Direct labor hours — 24,000    12,000   In the...
Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: Fabrication and...
Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours per Unit Machine Hours per Unit   Rings 910 6 6   Dings 2,710 3 7 All of the machine hours take place in the Fabrication Department, which has estimated total factory overhead of $86,700. All of the labor hours take place in the Assembly Department, which has estimated...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication and Assembly. The factory overhead budget for the Fabrication Department is $830,466, using 439,400 direct labor hours. The factory overhead budget for the Assembly Department is $506,466, using 67,800 direct labor hours. If a table lamp requires 4 hours of fabrication and 7 hour of assembly, the amount of factory overhead that Kaumajet Factory will allocate to each unit of table lamp using the...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication and Assembly. The factory overhead budget for the Fabrication Department is $605,088, using 343,800 direct labor hours. The factory overhead budget for the Assembly Department is $567,285, using 88,500 direct labor hours. If a table lamp requires 4 hours of fabrication and 7 hour of assembly, the amount of factory overhead that Kaumajet Factory will allocate to each unit of table lamp using the...
Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: Fabrication and...
Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours Per Unit Machine Hours Per Unit   Rings 970 6 8   Dings 2,120 8 7 All of the machine hours take place in the Fabrication Department, which has estimated total factory overhead of $81,900. All of the labor hours take place in the Assembly Department, which has estimated...
The total factory overhead for Bardot Marine Company is budgeted for the year at $833,250, divided...
The total factory overhead for Bardot Marine Company is budgeted for the year at $833,250, divided into two departments: Fabrication, $660,000, and Assembly, $173,250. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require two direct labor hours in Fabrication and one direct labor hour in Assembly. The bass boats require four direct labor hours in Fabrication and two direct labor hours in Assembly. Each product is budgeted for 5,500 units of production for the year....
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $348,000, divided into two departments: Fabrication, $162,000, and Assembly, $186,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require one direct labor hour in Fabrication and four direct labor hours in Assembly. The bass boats require one direct labor hour in Fabrication and four direct labor hours in Assembly. Each product is budgeted for 3,000...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $1,215,000, divided into two departments: Fabrication, $855,000, and Assembly, $360,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require four direct labor hours in Fabrication and one direct labor hour in Assembly. The bass boats require two direct labor hours in Fabrication and three direct labor hours in Assembly. Each product is budgeted for 7,500...
Koontz Company manufactures two models of industrial components—a Basic model and an Advanced Model. The company...
Koontz Company manufactures two models of industrial components—a Basic model and an Advanced Model. The company considers all of its manufacturing overhead costs to be fixed and it uses plantwide manufacturing overhead cost allocation based on direct labor-hours. Koontz’s controller prepared the segmented income statement that is shown below for the most recent year (he allocated selling and administrative expenses to products based on sales dollars):     Basic      Advanced      Total Number of units produced and sold      20,000  ...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication...
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication and Assembly. The factory overhead budget for the Fabrication Department is $646,286, using 547,700 direct labor hours. The factory overhead budget for the Assembly Department is $446,708, using 72,400 direct labor hours. If a desk lamp requires 2 hour of fabrication and 5 hours of assembly, the total amount of factory overhead that Kaumajet Factory will allocate to desk lamps using the multiple production...