Question

G.A. Courtney & Sons build homes. Each home is considered a job; costs are accumulated by...

G.A. Courtney & Sons build homes. Each home is considered a job; costs are accumulated by job to determine the final cost of a home. The company builds two types of homes. Standard models are framed at factory using high-tech machinery and take little direct labor to complete. Custom homes are framed and finished at the building site using mostly direct labor and few machine hours. Annual estimates for each department follow:

Framing

Finishing

Total

Total Overhead

$400,000

$167,600

$567,600

DLH

9,700

41,900

51,600

MH

160,000

-0-

160,000

During the year, five jobs were started and completed. Jobs #101 and #103 were custom homes. The remaining jobs were standard models. Direct materials (DM), direct labor (DL), direct labor hours (DLH), and machine hours (MH) for each job follow:

DM

DL

Framing

DLH

Finishing

DLH

Total

DLH

MH

Job #101

$364,000

$280,000

1,000

19,000

20,000

500

Job #102

90,000

100,000

2,800

500

3,300

46,500

Job #103

455,000

350,000

600

20,890

21,490

1,600

Job #104

144,000

160,000

2,100

800

2,900

52,000

Job #105

127,800

142,000

3,200

710

3,910

59,400

Total

$1,180,800

$1,032,000

9,700

41,900

51,600

160,000

REQUIRED:

(1)        Calculate the predetermined overhead rate (POR) using:

(a)        A single, plantwide cost pool and DLH as the application base.

(b)        Separate total overhead amounts for each department (one total for framing and one for finishing). Use MH as the application base for framing and DLH for finishing.

PLEASE SHOW ALL CALCULATIONS

Homework Answers

Answer #1

1-a.

Predetermined overhead rate = Estimated total overhead / Estimated total direct labor hours

Predetermined overhead rate = $567,600 / 51,600 = $11 per direct labor hour.

1-b.

Predetermined overhead rate (Framing) = Estimated overhead cost / Estimated machine hours

Predetermined overhead rate (Framing) = $400,000 / 160,000 = $2.5 per machine hour

Predetermined overhead rate (Finishing) = Estimated overhead cost / Estimated direct labor hours

Predetermined overhead rate (Finishing) = $167,600 / 41,900 = $4 per direct labor hour

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
2. Job Order Costing – Application of Overhead using a pre-determined OH rate (4pts):   Skaro, Ltd....
2. Job Order Costing – Application of Overhead using a pre-determined OH rate (4pts):   Skaro, Ltd. is a manufacturer that uses a job-order costing system. Assume Skaro uses a single plantwide predetermined Factory OH rate to apply overhead, and bases their predetermined OH rate on machine hours (Mh). At the beginning of 2020, the firm made the following estimates for the upcoming year: Estimated Direct labor hours (DLh) 5,100 DLh Estimated Machine hours (Mh) 22,000 Mh Estimated total Variable Factory...
Southwestern Fashions, Inc. which uses a job-order costing system, had two jobs in process at the...
Southwestern Fashions, Inc. which uses a job-order costing system, had two jobs in process at the start of the year: job no. 101 ($84,100) and job no. 102 ($53,500). The following information is available:    a. The company applies manufacturing overhead on the basis of machine hours (based on practical capacity). Budgeted overhead and machine activity for the year were anticipated to be $824,000, and 16,000 hours, respectively. b. The company worked on four jobs during the first quarter. Direct...
Entries and Schedules for Unfinished Jobs and Completed Jobs Mellow Company uses a job order cost...
Entries and Schedules for Unfinished Jobs and Completed Jobs Mellow Company uses a job order cost system. The following data summarize the operations related to production for April, the first month of operations: Materials purchased on account, $3,170. Materials requisitioned and factory labor used: Job No. Materials Factory Labor 101 $3,030 $3,160 102 3,700 4,270 103 2,450 2,090 104 8,300 7,840 105 5,270 5,970 106 3,850 3,790 For general factory use 1,030 4,680 Factory overhead costs incurred on account, $5,790....
Tinkle-Tinkle Glass Company makes glass globe paper weights for desks. The company uses a job-order cost...
Tinkle-Tinkle Glass Company makes glass globe paper weights for desks. The company uses a job-order cost system and predetermined overhead rates to apply manufacturing overhead cost to jobs. The predetermined overhead rate in the Fabrication Department is based on machine hours, and the rate in the Finishing Department is based on direct labor hours. At the beginning of the year, the company’s management made the following estimates for the year:                                                                                                             Department                                                                                                 Fabrication       Finishing Machine hours                                                                         83,000            28,000...
Hildreth Company uses a job order cost system. The following data summarize the operations related to...
Hildreth Company uses a job order cost system. The following data summarize the operations related to production for April, the first month of operations: Materials purchased on account, $2,120. Materials requisitioned and factory labor used: Job No. Materials Factory Labor 101 $1,820 $2,040 102 2,220 2,750 103 1,470 1,350 104 4,990 5,060 105 3,170 3,860 106 2,310 2,450 For general factory use 620 3,020 Factory overhead costs incurred on account, $3,480. Depreciation of machinery and equipment, $1,450. The factory overhead...
The Eagles Corporation uses a normal job-order costing system in its only production department. Overhead is...
The Eagles Corporation uses a normal job-order costing system in its only production department. Overhead is applied to jobs by a plant-wide overhead rate based on direct labor hours. The first year of operation began on December 1, 2016. During the month of December, Eagles Corporation purchased direct material with a total cost of $4,000. Of the $4,000, Eagles Corporation used $500 on Job 100. Job 100 was the only job worked during the month of December. Eagles Corporation also...
yler Tooling Company uses a job order cost system with overhead applied to products on the...
yler Tooling Company uses a job order cost system with overhead applied to products on the basis of machine-hours. For the upcoming year, the company estimated its total manufacturing overhead cost at $246,090 and total machine hours at 63,100. During the first month of operations, the company worked on three jobs and recorded the following actual direct materials cost, direct labor cost, and machine hours for each job: Job 101 Job 102 Job 103 Total Direct materials used $ 10,100...
Job Costs Using Activity-Based Costing Heitger Company is a job-order costing firm that uses activity-based costing...
Job Costs Using Activity-Based Costing Heitger Company is a job-order costing firm that uses activity-based costing to apply overhead to jobs. Heitger identified three overhead activities and related drivers. Budgeted information for the year is as follows: Activity Cost    Driver Amount of Driver Materials handling $ 72,000      Number of moves 3,000   Engineering 165,000      Number of change orders 10,000   Other overhead 280,000      Direct labor hours 50,000   Heitger worked on four jobs in July. Data are as follows: Job 13-43 Job 13-44...
Delph Company uses a job-order costing system and has two manufacturing departments—Molding and Fabrication. The company...
Delph Company uses a job-order costing system and has two manufacturing departments—Molding and Fabrication. The company provided the following estimates at the beginning of the year: Molding Fabrication Total Machine-hours 21,000 31,000 52,000 Fixed manufacturing overhead costs $ 710,000 $ 210,000 $ 920,000 Variable manufacturing overhead cost per machine-hour $ 5.70 $ 5.70 During the year, the company had no beginning or ending inventories and it started, completed, and sold only two jobs—Job D-70 and Job C-200. It provided the...
.Bright Window Company designs and builds custom windows for luxury homes. Most of the windows are...
.Bright Window Company designs and builds custom windows for luxury homes. Most of the windows are custom made but occasionally the company does mass production on order. Its budgeted manufacturing overhead costs for the year 2011 are as follows: Overhead Cost Pools                                                                            Amount               Purchasing                                                                              $   180,000             Production (cutting, milling, finishing)                                         400,000             Setting up machines                                                                    135,000             Inspecting                                                                                    160,000             Utilities                                                                                         300,000                   Total budget overhead costs                                            $1,175,000 For the last three years, the company...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT