"Normal costing" involves:

a) Using budgeted cost allocation rates for direct costs and actual costs for indirect costs.

b) Using budgeted cost pools for both direct and indirect costs.

c) Using budgeted cost allocation rates for indirect costs and actual costs direct costs.

d) using budgeted cost allocation rates for both direct and indirect costs.

Question: 2 Costs that are " similar in nature" and/or " driven by the same factor" are accumulated in a:

a) spreadsheet

b) cost object

c) cost pool

d) cost function

Question: 3 In a large corporation, the controller is typically responsible for:

a) Risk management.

b) All listed answers are correct.

c) Accounting information

d) Audit

e) Tax

Question: 4 "ABC" costing can lead to the following benefits

a) improved pricing decisions

b) all of the listed answers are correct

c) improved understanding of production processes

d) improved "indirect costing" accuracy.

please answer these question fast. thanks

Homework Answers

Answer #1

Solution 1:

"Normal costing" involves: "Using budgeted cost allocation rates for indirect costs and actual costs direct costs."

Hence option C is correct.

Solution 2:

Costs that are " similar in nature" and/or " driven by the same factor" are accumulated in a "Cost Pool"

Hence option c is correct.

solution 3:

In a large corporation, the controller is typically responsible for:

a) Risk Management

b) Accounting information

c) Audit

d) Tax

Hence option b "All listed answers are correct" is correct.

Solution 4:

"ABC" costing can lead to the following benefits:

a) improved pricing decisions

b) improved understanding of production processes

c) improved "indirect costing" accuracy.

Hence option b "all of the listed answers are correct" is correct.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Kimberlee Corporation manufactures custom cabinets for kitchens. It uses a normal costing system with two direct...
Kimberlee Corporation manufactures custom cabinets for kitchens. It uses a normal costing system with two direct costing categories- direct materials and direct manufacturing labor-- and one indirect cost pool, manufacturing overhead costs. It provides the following informtion for April 2017. Actual direct materials used      $75,000 Actual direct manufacturing labor costs paid in cash $55,000 Indirect materials used   $3,500 Supervision and engineering salaries paid in cash $49,000 Plant utilities and repairs paid in cash $13,000 Plant Depreciation $11,000 Actual direct manufacturing...
the method of determining overhead allocation using absorption costing and that under activity-based costing differs because:...
the method of determining overhead allocation using absorption costing and that under activity-based costing differs because: a. activity-based costing allocates costs to cost pools and traces costs to products based on cost driveres whereas absorption costing allocates costs to cost centers and then to products based on a measure of activity such as direct labor hours b. activity-based costing can never accurately allocate overheads to products because the method of allocation is arbitrary whereas absorption costing is always more reliable...
Volume-based costing allocates indirect product costs based on the volume of output, using such allocation bases...
Volume-based costing allocates indirect product costs based on the volume of output, using such allocation bases as direct labor hours, machine hours, or the amount of direct material used in the production process. Activity-based costing (ABC) has consistently shown that Volume-based costing ___________ the cost of high volume products and ______________ the cost of low volume products. High Volume Products Low Volume Products A. Overstates Overstates B. Overstates Understates C. Understates Overstates D. Understates Understates Option A Option B Option...
Which of the following is true of normal costing? a.Actual direct materials cost is traced to...
Which of the following is true of normal costing? a.Actual direct materials cost is traced to products, but estimated direct labor and estimated overhead costs are assigned using predetermined rates. b.Actual direct materials, actual direct labor, and actual overhead cost are assigned to products. c.Actual direct labor cost is traced to products, but estimated direct materials and estimated overhead costs are assigned using predetermined rates. d.Actual direct materials and direct labor costs are traced to products, but estimated overhead costs...
ABC Manufacturing uses normal costing and allocates manufacturing overhead to jobs based on a budgeted direct...
ABC Manufacturing uses normal costing and allocates manufacturing overhead to jobs based on a budgeted direct labor-hour rate for the actual direct labor hours. Any overallocated or underallocated overhead is written-off to the cost of goods sold at the end of the month. During April 2019, ABC Manufacturing recorded the following: Budgeted manufacturing overhead costs: $400,000 Budgeted direct labor-hours: 20,000 DLHRS Budgeted machine hours: 16,000 MHRS Actual manufacturing overhead costs: $360,000 Actual direct labor-hours:   22,500 DLHRS Actual machine hours: 15,000...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. A detailed estimate of what a product should cost.Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,800 units of product were as follows: Standard Costs Actual Costs Direct materials 8,800 lb. at $4.90 8,700...
1a) In applying costs using a predetermined overhead rate, the most common allocation base is generally...
1a) In applying costs using a predetermined overhead rate, the most common allocation base is generally a. indirect materials used. b. indirect labour hours. c. direct labour hours. d. direct materials used. 1b) Which one of the following is used to calculate the predetermined overhead rate? a. applied overhead costs b. predetermined overhead costs c. actual overhead costs d. estimated overhead costs
Which of the following statements regarding manufacturing overhead allocation is false in a normal costing system?...
Which of the following statements regarding manufacturing overhead allocation is false in a normal costing system? a. Total budgeted manufacturing overhead costs are known at the beginning of the accounting period.    b. It includes all manufacturing costs that can be directly traced to a product or service.    c. Allocated amounts are credited to Manufacturing Overhead Allocated Control.    d. The costs can be grouped as a single or multiple indirect-cost pool(s).
Howell Corporation's activity-based costing system has three activity cost pools--Machining, Setting Up, and Other. The company's...
Howell Corporation's activity-based costing system has three activity cost pools--Machining, Setting Up, and Other. The company's overhead costs, which consist of equipment depreciation and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Equipment depreciation (total) $ 29,400 Indirect labor (total) $ 7,380 Distribution of Resource Consumption Across Activity Cost Pools Machining Setting Up Other Equipment depreciation 0.30 0.20 0.50 Indirect labor 0.50 0.30 0.20 Costs in the Machining cost pool...
A company uses activity-based costing to determine the costs of its three products: A, B, and...
A company uses activity-based costing to determine the costs of its three products: A, B, and C. The budgeted cost and activity for each of the company's three activity cost pools are shown in the following table: Budgeted Activity Activity Cost Pool Budgeted Cost Product A Product B Product C Activity 1 $ 75,000 6,500 9,500 20,500 Activity 2 $ 50,000 7,500 15,500 8,500 Activity 3 $ 92,000 3,000 1,500 2,125 How much overhead will be assigned to Product B...