Question

The controller for Rainbow Children’s Hospital, located in Munich, Germany, estimates that the hospital uses 32...

The controller for Rainbow Children’s Hospital, located in Munich, Germany, estimates that the hospital uses 32 kilowatt-hours of electricity per patient-day, and that the electric rate will be 0.20 euro per kilowatt-hour. The hospital also pays a fixed monthly charge of 2,700 euros to the electric utility to rent emergency backup electric generators.

Required:

Construct a flexible budget for the hospital’s electricity costs using each of the following techniques.

  1. Formula flexible budget.

  2. Columnar flexible budget for 37,000, 47,000 and 57,000 patient-days of activity.

Complete this question by entering your answers in the tabs below.

  • Required 1
  • Required 2

Formula flexible budget. (Round per unit to 2 decimal places.)

Total budgeted monthly overhead cost = Budgeted variable overhead cost per activity unit x Total activity units + Bugeted fixed overhead cost per month
x patient days +

Columnar flexible budget for 37,000, 47,000 and 57,000 patient-days of activity.

Patient Days
37,000 47,000 57,000
Variable electricity cost
Fixed electricity cost
Total electricity cost €0 €0 €0

Homework Answers

Answer #1

Solution:

Budgeted variable overhead cost per activity unit = 32 kilowatt hours *$0.20 per kilowatt hour = $6.40 per patient day

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Capelli Hospital bases its budgets on patient-visits. The hospital's static budget for August appears below: Budgeted...
Capelli Hospital bases its budgets on patient-visits. The hospital's static budget for August appears below: Budgeted number of patient-visits 8,500 Budgeted variable costs: Supplies (@$9.60 per patient-visit) $ 81,600 Laundry (@$9.30 per patient-visit) 79,050 Total variable cost 160,650 Budgeted fixed costs: Wages and salaries 99,800 Occupancy costs 107,800 Total fixed cost 207,600 Total cost $ 368,250 The total variable cost at the activity level of 8,600 patient-visits per month should be:
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an...
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an adequate staff of attending and on-call physicians at all times, so physician costs are not affected by the number of patient visits. But all other costs do vary with patient activity. Nurse-hours are used as the activity measure for nurse costs, and patient visits are used as the activity measure for the cost of supplies and other variable costs. The head physician of the...
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an...
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an adequate staff of attending and on-call physicians at all times, so physician costs are not affected by the number of patient visits. But all other costs do vary with patient activity. Nurse-hours are used as the activity measure for nursing costs, and patient visits are used as the activity measure for the cost of supplies and other variable costs. The head physician of the...
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an...
Providence Hospital generates monthly performance reports for each of its departments. The hospital must maintain an adequate staff of attending and on-call physicians at all times, so physician costs are not affected by the number of patient visits. But all other costs do vary with patient activity. Nurse-hours are used as the activity measure for nursing costs, and patient visits are used as the activity measure for the cost of supplies and other variable costs. The head physician of the...
McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials...
McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of items such as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labor costs (e.g., surgeons, anesthesiologists, radiologists, and nurses) associated with specific surgical procedures and tests are traced to individual patients. All other costs, such as depreciation of medical equipment, insurance, utilities, incidental medical supplies, and the labor costs associated with around-the clock monitoring of patients are treated...
Alden Company uses a two-variance analysis for overhead variances. Practical capacity is defined as 36 setups...
Alden Company uses a two-variance analysis for overhead variances. Practical capacity is defined as 36 setups and 36,000 machine hours to manufacture 7,200 units for the year. Selected data for 2016 follow:   Budgeted fixed factory overhead:      Setup   $ 57,600         Other 265,000 $ 322,600   Total factory overhead incurred $ 494,000   Variable factory overhead rate:      Per setup $ 650      Per machine hour $ 4   Total standard machine hours allowed for the units manufactured 24,000 hours   Machine hours actually worked 28,000 hours...
Birkner Corporation's flexible budget performance report for last month shows that actual indirect materials cost, a...
Birkner Corporation's flexible budget performance report for last month shows that actual indirect materials cost, a variable cost, was $30,444 and that the spending variance for indirect materials cost was $8,142 favorable. During that month, the company worked 17,700 machine-hours. Budgeted activity for the month had been 18,200 machine-hours. The cost formula per machine-hour for indirect materials cost must have been closest to: Kerekes Manufacturing Corporation has prepared the following overhead budget for next month. Activity level 2,400 machine-hours Variable...
Paynesville Corporation manufactures and sells a preservative used in food and drug manufacturing. The company carries...
Paynesville Corporation manufactures and sells a preservative used in food and drug manufacturing. The company carries no inventories. The master budget calls for the company to manufacture and sell 116,000 liters at a budgeted price of $195 per liter this year. The standard direct cost sheet for one liter of the preservative follows. Direct materials (2 pounds @ $12) $ 24 Direct labor (0.5 hours @ $40) 20 Variable overhead is applied based on direct labor hours. The variable overhead...
Activity-Based Flexible Budgeting Foy Company has a welding activity and wants to develop a flexible budget...
Activity-Based Flexible Budgeting Foy Company has a welding activity and wants to develop a flexible budget formula for the activity. The following resources are used by the activity: Four welding units, with a lease cost of $14,000 per year per unit Six welding employees each paid a salary of $55,000 per year (A total of 12,000 welding hours are supplied by the six workers.) Welding supplies: $400 per job Welding hours: 4 hours used per job During the year, the...
Flexible Budget for Varying Levels of Activity Nashler Company has the following budgeted variable costs per...
Flexible Budget for Varying Levels of Activity Nashler Company has the following budgeted variable costs per unit produced: Direct materials $7.20 Direct labor 1.54 Variable overhead:   Supplies 0.23   Maintenance 0.19   Power 0.18 Budgeted fixed overhead costs per month include supervision of $98,000, depreciation of $76,000, and other overhead of $245,000. In March, Nashler Company produced 160,000 units and had the following actual costs: Direct materials $1,148,000 Direct labor 252,900 Supplies 37,300 Maintenance 30,340 Power 28,730 Supervision 99,400 Depreciation 76,000 Other...