Question

Plaid Manufacturing Co. produces two products: G1 and M1. The company uses an activity based costing...

Plaid Manufacturing Co. produces two products: G1 and M1. The company uses an activity based costing system. The following are the activities, budgeted total cost and cost drivers per activity for the year 20x9:

Activity

Budgeted Cost

Cost Base

Cost Base Volume

Assembly

$878375

# of DL hours

35836

Inspection

$650181

# of units

22538

Shipping

$321938

# of batches

199


Budgeted data relating to the production of M1 for 20x9 is given below:

Number of units

1500

Units per batch

75

Direct labour hours (@ $18 per hour)

18001 hours

Direct materials (@ $13.12 per kg.)

888 kg.


What is the total cost of producing M1 in 20x9?

Select one:

a. $852518

b. $528500

c. $941496

d. $516850

Homework Answers

Answer #1

--Correct Answer = Option 'a' $ 852,518

Cost of producing M1
Direct Material $11,651
Direct Labor cost $324,018
Assembly cost $441,222
Inspection cost $43,272
Shipping Cost $32,356
Total cost of producing $852,518 ANSWER

--Workings

Cost of producing M1
Direct Material =888*13.12
Direct Labor cost =18001*18
Assembly cost =+(878375/35836)*18001
Inspection cost =+(650181/22538)*1500
Shipping Cost =+(321938/199)*20 batches
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Goodwin Co. manufactures two products: R and W. The company uses activity-based costing to apply manufacturing...
Goodwin Co. manufactures two products: R and W. The company uses activity-based costing to apply manufacturing overhead costs to products. The cost pools and related estimated overhead costs for 20x3 are as follows: Activity Cost Pool Activity measure Overhead cost Assembly Number of direct labour hours $35194 Inspection Number of inspections 159307 Product support # of engineers 252107 The expected activity measures for the manufacturing of product R in 20x3 are: 141 direct labour hours, 4901 inspections, and 2 engineer(s)....
Goodwin Co. manufactures two products: R and W. The company uses activity-based costing to apply manufacturing...
Goodwin Co. manufactures two products: R and W. The company uses activity-based costing to apply manufacturing overhead costs to products. The cost pools and related estimated overhead costs for 20x3 were as follows: Activity Cost Pool Activity measure Overhead cost Purchase orders Number of purchase orders $34475 Assembly Number of direct labour hours 152143 The expected activity measures for the manufacturing product R in 20x3 were: 228 purchase orders and 4560 direct labour hours. The expected activity measures for the...
Waymire Ltd. currently uses a traditional costing system based on direct labour hours to allocate overhead....
Waymire Ltd. currently uses a traditional costing system based on direct labour hours to allocate overhead. This year, the company has budgeted to produce 1721 units of one of its products. Each unit requires 4 hours of direct labour. For the coming year, the company is considering changing to an activity based costing system by allocating overhead based on 3 activities. The following are the activities, budgeted total cost and cost drivers per activity for the upcoming year: Activity Cost...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool Base Budgeted Activity Budgeted Cost Machine set up # of setups 2710 $24804 Orders # of orders 991 $96484 Shipping Hours of shipping time 2233 $41621 In addition, prior to adopting an activity based costing system, Company Co. applied overhead based on direct labour hours. The budgeted total labour hours for the year was 54645. If one job required 424 direct labour hours, 39...
Trailers R Us Company, which uses an activity-based costing system, produces travel trailers and boat trailers....
Trailers R Us Company, which uses an activity-based costing system, produces travel trailers and boat trailers. The company allocates batch setup costs to the two products using the following basic data: ​ Travel trailers Boat trailers Budgeted units to be produced 2350 2900 Budgeted number of setups 320 530 Budgeted number of direct labor hours per unit 30 60 Total budgeted setup costs for the year are $161,400. If the setup costs are allocated using direct labor hours, how much...
A company uses activity-based costing to determine the costs of its three products: A, B, and...
A company uses activity-based costing to determine the costs of its three products: A, B, and C. The budgeted cost and activity for each of the company's three activity cost pools are shown in the following table: Budgeted Activity Activity Cost Pool Budgeted Cost Product A Product B Product C Activity 1 $ 75,000 6,500 9,500 20,500 Activity 2 $ 50,000 7,500 15,500 8,500 Activity 3 $ 92,000 3,000 1,500 2,125 How much overhead will be assigned to Product B...
ack Inc. manufactures two products and uses an activity-based costing system. Jack currently classifies machine setup...
ack Inc. manufactures two products and uses an activity-based costing system. Jack currently classifies machine setup costs of $120,000 as batch-level. Product A Product B Units 50,000 75,000 Batches 100 400 Direct Materials $10 per unit $10 per unit Direct Labour $15 per unit $15 per unit What will be the effect on the unit cost of Product A if Jack classifies the machine setup costs as product-level? Select one: a. It will decrease by $0.72 b. It will increase...
Roti Boy Inc. makes 2 distinct products and uses an activity-based (ABC) costing system. Some of...
Roti Boy Inc. makes 2 distinct products and uses an activity-based (ABC) costing system. Some of the cost information for the company is as follows: Product A Product B Total units produced 100,000 50,000 Number of units per batch 2, 000 5, 000 Batch-level Overhead Costs: Total batch level overhead cost: $60,000. Batch level overhead cost is made up entirely of machine set up costs The machine set up cost per batch is the same for both Product A and...
Coats Galore Inc. uses activity-based costing as the basis for information to set prices for its...
Coats Galore Inc. uses activity-based costing as the basis for information to set prices for its six lines of seasonal coats. Calculate the activity-based overhead rates using the following budgeted data for each of the activity cost pools. (Round answers to 2 decimal places, e.g. 15.25.) Activity Cost Pools Estimated Overhead Estimated Use of Cost Drivers per Activity Designing $494,460 16,400 designer hours Sizing and cutting 4,121,040 184,800 machine hours Stitching and trimming 1,600,525 87,700 labour hours Wrapping and packing...
Hopscotch​ Limited, a manufacturer of a variety of​ products, uses an activity−based costing system. Information from...
Hopscotch​ Limited, a manufacturer of a variety of​ products, uses an activity−based costing system. Information from its system for the year for all products​ follows: Activity cost pool   Total cost Total activity Assembly $584,900 21,000 machine−hours Inspection $342,000 8,500 inspection−hours Packaging $24,600 1,400 order Hopscotch Limited makes 490 of its product B63 a​ year, which requires a total of 34 machine​ hours, 11 inspection​ hours, and 20 orders. Product B63 requires $45.70 in direct materials per unit and $57.20 in...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT