Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $20,600 per load....

Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $20,600 per load. The milling process produces 3,000 units of grade A with a market value of $64,400, and 12,000 units of grade B with a market value of $9,200. The cost of the milling process is $9,000 per load.

Required:

a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to each product? (Do not round intermediate calculations.)

b. If the costs of the logs and the milling process are allocated on the basis of the net realizable value, what cost will be assigned to each product? (Do not round intermediate calculations.)

c-1. How much profit or loss does the grade B lumber provide using the data in this problem and your analysis in requirement (a)? (Do not round intermediate calculations.)

c-2. Is it really possible to determine which product is more profitable?

Yes
No

Homework Answers

Answer #1
A) allocation based on units
Cost to be allocated = $20,600 + $9,000 = $29,600
Grade A = $29,600 * 3000/15000 =$5,920
Grade B = $29,600*12000/15000 = $23,680
B) allocation based on NRV
Grade A = $29,600*$64,400/$73,600 = $25,900
Grade B = $29,600*$9,200/$73,600 = $3,700
C-1) profit / (loss) = NRV - cost allocated
= $9,200- $23,680
= ($14,480)
C-2) No it's not possible to determine which product is more profitable , it require specific cost allocation. Because in both above allocation there is a huge variance.
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,200 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,200 per load. The milling process produces 5,000 units of grade A with a market value of $86,800, and 20,000 units of grade B with a market value of $12,400. The cost of the milling process is $17,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,800 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,800 per load. The milling process produces 5,000 units of grade A with a market value of $78,400, and 15,000 units of grade B with a market value of $11,200. The cost of the milling process is $14,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $19,400 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $19,400 per load. The milling process produces 4,000 units of grade A with a market value of $47,600, and 12,000 units of grade B with a market value of $6,800. The cost of the milling process is $3,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $19,600 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $19,600 per load. The milling process produces 4,000 units of grade A with a market value of $50,400, and 12,000 units of grade B with a market value of $7,200. The cost of the milling process is $4,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,800 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,800 per load. The milling process produces 5,000 units of grade A with a market value of $78,400, and 15,000 units of grade B with a market value of $11,200. The cost of the milling process is $14,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,600 per load....
Prescott Lumber processes logs into grade A and grade B lumber. Logs cost $18,600 per load. The milling process produces 5,000 units of grade A with a market value of $81,200, and 15,000 units of grade B with a market value of $11,600. The cost of the milling process is $15,000 per load. Required: a. If the costs of the logs and the milling process are allocated on the basis of units of output, what cost will be assigned to...
Snake River Sawmill manufactures two lumber products from a joint milling process. The two products developed...
Snake River Sawmill manufactures two lumber products from a joint milling process. The two products developed are mine support braces (MSB) and unseasoned commercial building lumber (CBL). A standard production run incurs joint costs of $410,000 and results in 71,000 units of MSB and 101,000 units of CBL. Each MSB sells for $5, and each unit of CBL sells for $13. Assume the commercial building lumber is not marketable at split-off but must be further planed and sized at a...
Newcastle​ Sawmill, Inc.,​(N​SI), purchases logs from independent timber contractors and processes the logs into three types...
Newcastle​ Sawmill, Inc.,​(N​SI), purchases logs from independent timber contractors and processes the logs into three types • Studs for residential buildings (walls, ceilings) • Decorative pieces (fireplace mantels, beams for cathedral ceilings) • Posts used as support braces (mine support braces, braces for exterior fences on ranch properties) of lumber products. These products are the result of a joint sawmill process that involves removal of bark from the​ logs, cutting the logs into a workable size​ (ranging from 8 to...
Tango Company produces joint products M, N, and T from a joint process. This information concerns...
Tango Company produces joint products M, N, and T from a joint process. This information concerns a batch produced in April at a joint cost of $130,000: After Split-Off Product Units Produced and Sold Total Separable Costs Total Final Sales Value M 11,000 $ 10,000 $ 170,000 N 5,000 9,200 150,000 T 6,000 7,800 27,000 Required: How much of the joint cost should be allocated to each joint product using the net realizable value method? (Do not round intermediate calculations....
Physical Units Method, Relative Sales-Value-at-Split-off Method, Net Realizable Value Method, Decision Making Sonimad Sawmill, Inc. (SSI),...
Physical Units Method, Relative Sales-Value-at-Split-off Method, Net Realizable Value Method, Decision Making Sonimad Sawmill, Inc. (SSI), purchases logs from independent timber contractors and processes them into the following three types of lumber products: Studs for residential construction (e.g., walls and ceilings) Decorative pieces (e.g., fireplace mantels and beams for cathedral ceilings) Posts used as support braces (e.g., mine support braces and braces for exterior fences around ranch properties) These products are the result of a joint sawmill process that involves...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT