tee allocated additional overhead to product x= $23,000 after switching to abc. previously overhead was allocated...

tee allocated additional overhead to product x= $23,000 after switching to abc. previously overhead was allocated using only direct labor hours. under abc overhead is now allocated using both direct labor hours and machine hours. product x uses 57 percent of machine time. $127,000 has been assigned to the machine pool. what is the product x's direct labor percentage?

direct labor percentage________

Homework Answers

Answer #1

tee allocated additional overhead to product x= $23,000.

Assigned to the machine pool = . $127,000

Calculating  product x's direct labor percentage.

tee allocated additional overhead to product/ Assigned to the machine poolx 100

= (23,000/ 127,000) x 100

= 0.1811023622 x 100

= 18 %

Direct labor percentage__18%______

Any doubt comment below i will explain or resolve until you got....
PLEASE.....UPVOTE....ITS REALLY HELPS ME....THANK YOU....SOOO MUCH....

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Aresco Corporation manufactures two products: Product G51B and Product E48X. The company uses a plantwide overhead...
Aresco Corporation manufactures two products: Product G51B and Product E48X. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products G51B and E48X. Activity Cost Pool Activity Measure Total Cost Total Activity Machining Machine-hours $100,000 5,000 MHs Machine setups Number of setups $300,000 500...
ABC Corporation uses activity-based costing to compute product margins. Overhead costs have already been allocated to...
ABC Corporation uses activity-based costing to compute product margins. Overhead costs have already been allocated to the company's three activity cost pools--Machining, Order Filling, and Other. The costs in those activity cost pools appear below: Machining $ 15,800 Order Filling $ 6,400 Other $ 9,800 Machining costs are assigned to products using machine-hours (MHs) and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products....
Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The...
Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $745,200 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:    Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity   Machining Machine-hours $ 200,000   ...
Foundational [LO4-1, LO4-2, LO4-3, LO4-4] Greenwood Company manufactures two products—14,000 units of Product Y and 6,000...
Foundational [LO4-1, LO4-2, LO4-3, LO4-4] Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining...
Flemming Corporation uses activity-based costing to compute product margins. Overhead costs have already been allocated to...
Flemming Corporation uses activity-based costing to compute product margins. Overhead costs have already been allocated to the company's three activity cost pools--Machining, Order Filling, and Other. The costs in those activity cost pools appear below: Machining $ 20,900 Order Filling $ 22,900 Other $ 29,200 Machining costs are assigned to products using machine-hours (MHs) and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products....
EcoFabrics has budgeted overhead costs of $1,077,300. It has allocated overhead on a plantwide basis to...
EcoFabrics has budgeted overhead costs of $1,077,300. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 513,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
EcoFabrics has budgeted overhead costs of $963,900. It has allocated overhead on a plantwide basis to...
EcoFabrics has budgeted overhead costs of $963,900. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 459,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
Coronado has budgeted overhead costs of $1,134,000. It has allocated overhead on a plantwide basis to...
Coronado has budgeted overhead costs of $1,134,000. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 540,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the...
Part 1 ABC uses activity based costing where overhead from three different production departments are allocated...
Part 1 ABC uses activity based costing where overhead from three different production departments are allocated to products as follows: Activity                 Driver - Activity Rate - Product A - Product B Cutting Machine Hours - $2.00 per machine hour - 2,000 hours - 3,000 hours Assembly            Assembly Hours - $.50 per assembly hour - 3,000 hours - 5,000 hours Painting                Gallons of Paint - $5.00 per gallon - 1,500 gallons - 1,300 gallons Raw materials are directly followed to...