Question

Time Remaining 22 minutes 50 seconds 00:22:50 ItemSkipped Item 4 Item 4 Item Skipped Time Remaining...

Time Remaining 22 minutes 50 seconds

00:22:50

ItemSkipped

Item 4

Item 4 Item Skipped

Time Remaining 22 minutes 50 seconds

00:22:50

Sheen Co. manufacturers laser printers. It has outlined the following overhead cost drivers:

Overhead Costs Pool Cost Driver Overhead Cost Budgeted Level for
Cost Driver
Quality control Number of inspections $ 75,000 1,500
Machine operation Machine hours 146,000 1,000
Materials handling Number of batches 900 30
Miscellaneous overhead cost Direct labor hours 54,000 4,500

Sheen Co. has an order for 1,000 laser printers that has the following production requirements:

Number of inspections 225
Machine hours 205
Number of batches 5
Direct labor hours 700

What is the total overhead cost per unit of the laser printers order using activity-based costing? (Rounded to the nearest cent.)

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Item19 Time Remaining 26 minutes 3 seconds 00:26:03 Item 19 Item 19 Time Remaining 26 minutes...
Item19 Time Remaining 26 minutes 3 seconds 00:26:03 Item 19 Item 19 Time Remaining 26 minutes 3 seconds 00:26:03 A mismatch between the geographic location of workers and the location of job openings would result in which type of unemployment? Multiple Choice wait cyclical frictional structural
Time Remaining 35 minutes 30 seconds 00:35:30 Item 8 Item 8 Time Remaining 35 minutes 30...
Time Remaining 35 minutes 30 seconds 00:35:30 Item 8 Item 8 Time Remaining 35 minutes 30 seconds 00:35:30 A pension fund manager is considering three mutual funds. The first is a stock fund, the second is a long-term government and corporate bond fund, and the third is a T-bill money market fund that yields a rate of 5%. The probability distribution of the risky funds is as follows: Expected Return Standard Deviation Stock fund (S) 20 % 35 % Bond...
Wings Co. budgeted $569,000 manufacturing direct wages, 2,500 direct labor hours, and had the following manufacturing...
Wings Co. budgeted $569,000 manufacturing direct wages, 2,500 direct labor hours, and had the following manufacturing overhead: Overhead Cost Pool Budgeted Overhead Cost Budgeted Level for Cost Driver Overhead Cost Driver Materials handling $ 184,000 4,600 pounds Weight of materials Machine setup 15,900 530 setups Number of setups Machine repair 1,200 30,000 machine hours Machine hours Inspections 21,000 300 inspections Number of inspections Requirements for Job #971 which manufactured 4 units of product: Direct labor 20 hours Direct materials 190...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers Maintenance $20,000 10,000 machine hours Material handling $25,000 250 moves Machine setup $30,000 1,000 hours Inspection $25,000 500 inspections Total $100,000 N/A The following information pertains to two representative jobs completed during January: Item Job 101 Job 102 Direct materials $10,000 $7,500 Direct labor $8,000 $5,000 Units produced 2,000 1,500 Direct labor hours 640 400 Machine hours 700 650 Number of material moves 40...
A company has identified the following overhead costs and cost drivers for the coming year:     ...
A company has identified the following overhead costs and cost drivers for the coming year:               Budgeted   Overhead Item   Cost Driver Budgeted Cost    Activity Level   Machine setup   Number of setups $ 25,300           220           Inspection   Number of inspections 124,200         4,600           Material handling   Number of material moves 99,200         6,200           Engineering   Engineering hours 12,400         620                  Budgeted direct labor cost was $130,550 and budgeted direct material cost was $369,540. The following information was collected on...
Time Remaining 2 hours 59 minutes 15 seconds 02:59:15 Item 1 Item 1 Time Remaining 2...
Time Remaining 2 hours 59 minutes 15 seconds 02:59:15 Item 1 Item 1 Time Remaining 2 hours 59 minutes 15 seconds 02:59:15 ProForm acquired 80 percent of ClipRite on June 30, 2020, for $1,520,000 in cash. Based on ClipRite's acquisition-date fair value, an unrecorded intangible of $500,000 was recognized and is being amortized at the rate of $17,000 per year. No goodwill was recognized in the acquisition. The noncontrolling interest fair value was assessed at $380,000 at the acquisition date....
Tiger Company has identified the following overhead costs and cost drivers for next year: Overhead Item...
Tiger Company has identified the following overhead costs and cost drivers for next year: Overhead Item Expected Costs Cost Driver Maximum Quantity Setup costs $583,200 Number of setups 2,400 Ordering costs 270,000 Number of orders 20,000 Maintenance 928,000 Machine-hours 32,000 Power 90,000 Kilowatt-hours 200,000 The following are two of the jobs completed during the year: Job 201 Job 202 Direct materials $9,000 $10,000 Direct labor $12,000 7,000 Units completed 750 600 Direct labor-hours 45 110 Number of setups 6 7...
Tiger Company has identified the following overhead costs and cost drivers for next year: Overhead Item...
Tiger Company has identified the following overhead costs and cost drivers for next year: Overhead Item Expected Costs Cost Driver Setup costs $583,200 Number of setups Ordering costs 270,000 Number of orders Maintenance 928,000 Machine-hours Power 90,000 Kilowatt-hours The following are two of the jobs completed during the year: Job 201 Job 202 Direct materials $9,000 $10,000 Direct labor $12,000 7,000 Units completed 750 600 Direct labor-hours 45 110 Number of setups 6 7 Number of orders 8 15 Machine-hours...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in...
Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. (Loss amounts should be indicated with a minus sign. Round your intermediate calculations and round "Cost per unit and OH rate" answers to 2 decimal places.) Process Activity Overhead Cost Driver...
Elevated Expectations Company projected the following overhead costs and cost drivers for past year (assume that...
Elevated Expectations Company projected the following overhead costs and cost drivers for past year (assume that actual overhead and budgeted overhead were the same): Overhead Item Expected Costs Cost Driver Expected Quantity Setup costs $12,150 Number of setups 50 Ordering costs 4,050 Number of orders 30 Maintenance 17,400 Machine-hours 600 Power 3,000 Kilowatt-hours 600 Direct Labor Hours 500 Elevated Expectations contracted for 2 jobs, both of which were completed during the year. Production managers reported the following data in relation...