Question

Miles Plumbing has calculated their predetermined overhead rate as $5 per hour spent on the job....

Miles Plumbing has calculated their predetermined overhead rate as $5 per hour spent on the job. Don Miles spent 10 hours at the Smith household on a job. Miles Plumbing charges direct labor at $10 per hour and used $40 of material. What was the job cost for the Smith household job? Calculate to the nearest whole number and without $ sign.  

Homework Answers

Answer #1

Answer:

The Job Cost for the Smith Household Job is 190

(Dollar sign not used above as per the instruction in the question)

Given in the question that,

Total Labor Hours = 10 hrs spent by Don Miles

Direct Labor Charges = $10 per hour

Predetermined Overhead rate = $5 per hour spent on the job

Material Charges = $40

*Overhead Predetermined rate is $5 per hour

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
5. Assume (1) a company’s plantwide predetermined overhead rate is $13.00 per direct labor-hour, and (2)...
5. Assume (1) a company’s plantwide predetermined overhead rate is $13.00 per direct labor-hour, and (2) its job cost sheet for Job X shows that this job incurred direct materials and direct labor charges of $500 and $360, respectively. If Job X’s total job cost is $1,289, how many direct labor-hours were worked on this job? 6. Assume (1) actual machine-hours worked during the period of 54,000 hours, (2) estimated machine-hours to be worked during the period of 55,600 hours,...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 40,000 Total fixed manufacturing overhead cost $ 96,000 Variable manufacturing overhead per direct labor-hour $ 3.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 20 Total direct labor-hours 100 Direct materials $ 755 Direct labor cost $...
10. Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based...
10. Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 32,500 Total fixed manufacturing overhead cost $455,000 Variable manufacturing overhead per machine-hour $ 5.00 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 710 Direct labor cost $1,420 If the company marks...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 30,200 Total fixed manufacturing overhead cost $ 120,800 Variable manufacturing overhead per machine-hour $ 6 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 710 Direct labor cost $ 1,410 The total job...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 32,000 Total fixed manufacturing overhead cost $ 352,000 Variable manufacturing overhead per machine-hour $ 3.00 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 675 Direct labor cost $ 1,350 The amount of...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 64,000 Total fixed manufacturing overhead cost $678,400 Variable manufacturing overhead per direct labor-hour $ 5.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 30 Total direct labor-hours 300 Direct materials $ 1,350 Direct labor cost $ 11,400...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 40,000 Total fixed manufacturing overhead cost $ 96,000 Variable manufacturing overhead per direct labor-hour $ 3.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 20 Total direct labor-hours 100 Direct materials $ 755 Direct labor cost $...
​Sybil, Inc. uses a predetermined overhead allocation rate to allocate manufacturing overhead costs to jobs. The...
​Sybil, Inc. uses a predetermined overhead allocation rate to allocate manufacturing overhead costs to jobs. The company recently completed Job 300X. This job used 14 machine hours and 4 direct labor hours. The predetermined overhead allocation rate is calculated to be​ $44 per machine hour. What is the amount of manufacturing overhead allocated to Job 300X using machine hours as the allocation​ base? a. 176 b. 616 c. 792 d. 440
Meenach Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Meenach Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on 58,000 direct labor-hours, total fixed manufacturing overhead cost of $58,000, and a variable manufacturing overhead rate of $2.90 per direct labor-hour. Recently Job X387 was completed and required 220 direct labor-hours. Required: Calculate the amount of overhead applied to Job X387
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 47,000 Total fixed manufacturing overhead cost $ 202,100 Variable manufacturing overhead per direct labor-hour $ 2.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 50 Total direct labor-hours 100 Direct materials $ 850 Direct labor cost $...