Spin Cycle Architecture uses three activity pools to apply
overhead to its projects. Each activity has a cost driver used to
allocate the overhead costs to the projects. The activities and
related overhead costs are as follows: initial concept formation
$40,000; design $300,000; and construction oversight $100,000. The
cost drivers and estimated use are as follows.
Activities |
Cost Drivers |
Estimated Use of Cost |
||
Initial concept formation | Number of project changes | 20 | ||
Design | Square feet | 150,000 | ||
Construction oversight | Number of months | 100 |
(a) Compute the predetermined overhead rate for
each activity.
Overhead Rate |
|||
Initial concept formation |
$ |
per project change | |
Design |
$ |
per square foot | |
Construction oversight |
$ |
Per month |
(b) Classify each of these activities as
unit-level, batch-level, product-level, or
facility-level.
Activities |
Level |
|
Initial concept formation |
Facility-levelUnit-levelBatch-levelProduct-level |
|
Design |
Product-levelUnit-levelBatch-levelFacility-level |
|
Construction oversight |
Facility-levelBatch-levelUnit-levelProduct-level |
(a)-Predetermined overhead rate for each activity. |
Overhead rate for Initial concept formation |
Overhead rate = $40,000 / 20 Project changes |
Overhead rate = $2,000 per Project change |
Overhead rate for Design |
Overhead rate = $300,000 / 150,000 Square feet |
Overhead rate = $2.00 per Square feet |
Overhead rate for Construction |
Overhead rate = $100,000 / 100 months |
Overhead rate = $1,000 per month |
(b)-Activity Levels |
Initial concept formation - Product Level |
Design - Unit Level |
Construction oversight - Batch Level |