Question

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data.
  

Rounded Edge Squared Edge Total
Direct materials $ 9,500 $ 21,700 $ 31,200
Direct labor 6,100 12,000 18,100
Overhead (300% of direct labor cost) 18,300 36,000 54,300
Total cost $ 33,900 $ 69,700 $ 103,600
Quantity produced 10,300 ft. 14,100 ft.
Average cost per ft. (rounded) $ 3.29 $ 4.94

  
Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,300 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information.

Overhead Cost Category
(Activity Cost Pool)
Cost
Supervision $ 2,172
Depreciation of machinery 29,000
Assembly line preparation 23,128
Total overhead $ 54,300

  
She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.)

Usage
Overhead Cost Category
(Activity Cost Pool)
Driver Rounded Edge Squared Edge Total
Supervision Direct labor cost ($) $ 6,100 $ 12,000 $ 18,100
Depreciation of machinery Machine hours 400 hours 700 hours 1,100 hours
Assembly line preparation Setups (number) 31 times 94 times 125 times
1. Assign these three overhead cost pools to each of the two products using ABC.
Activity Overhead Cost Activity Drivers Activity Rate
Supervision Direct labor cost %
Depreciation of machinery Machine hours
Assembly line preparation Setups
Rounded edge Activity rate Activity driver incurred Overhead assigned
Supervision % 0
Depreciation of machinery 0
Assembly line preparation 0
Squared edge Activity rate Activity driver incurred Overhead assigned
Components
Supervision % 0
Depreciation of machinery 0
Assembly line preparation 0
2. Determine average cost per foot for each of the two products using ABC.
Rounded edge Squared edge

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional...
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow:      Fabric Case Leather Case Number of labor hours 24,000 9,000 Number of material moves 798 1,102 Number of setups 42 188 Total estimated overhead costs are...
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional...
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow:        Fabric Case   Leather Case Number of labor hours   14,000      16,000      Number of material moves   765      935      Number of setups   45  ...
Woodland Industries manufactures and sells 5,500 units each of two types of windows: Window A and...
Woodland Industries manufactures and sells 5,500 units each of two types of windows: Window A and Window B. Woodland Industries estimates a total of $6,210,000 in overhead across both product lines. Overhead is traditionally allocated based on a total of 30,000 direct labor hours for both product lines where Window A uses 14,400 direct labor hours while Window B uses 15,600 direct labor hours. Woodland Industries is considering activity based costing using three activities: Materials Handling, Cutting and Lathing, Assembly...
Woodland Industries manufactures and sells 5,500 units each of two types of windows: Window A and...
Woodland Industries manufactures and sells 5,500 units each of two types of windows: Window A and Window B. Woodland Industries estimates a total of $6,210,000 in overhead across both product lines. Overhead is traditionally allocated based on a total of 30,000 direct labor hours for both product lines where Window A uses 14,400 direct labor hours while Window B uses 15,600 direct labor hours. Woodland Industries is considering activity based costing using three activities: Materials Handling, Cutting and Lathing, Assembly...
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs...
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Labor Indirect Materials Other Overhead Grinding $ 320,000 Polishing $ 195,000 Product modification 400,000 Providing power $ 210,000 System calibration 480,000 Additional information on the drivers for its production activities follows. Grinding 16,000 machine hours Polishing 16,000 machine hours Product modification 2,100 engineering hours Providing power 20,000 direct labor hours System calibration 1,500 batches Job...
Coronado Manufacturing produces two products in its Saratoga plant, balzene and galvene. Since it opened its...
Coronado Manufacturing produces two products in its Saratoga plant, balzene and galvene. Since it opened its doors in 1965, Coronado has been using a single manufacturing overhead pool to accumulate overhead costs. Overhead has been allocated to products based on direct labor hours. Until recently, Coronado was the sole producer of galvene in the country and was therefore able to dictate the selling price. However, last year Marcella Products began marketing a comparable product at $56 per unit—a price that...
Snowden Industries produces two electronic decoders, P and Q. Decoder P is more sophisticated and requires...
Snowden Industries produces two electronic decoders, P and Q. Decoder P is more sophisticated and requires more programming and testing than does Decoder Q. Because of these product differences, the company wants to use activity-based costing to allocate overhead costs. It has identified four activity pools. Relevant information follows: Activity Pools Cost Pool Total Cost Driver Repair and maintenance on assembly machine $ 104,000 Number of units produced Programming cost 168,000 Number of programming hours Software inspections 12,000 Number of...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Assign overhead using traditional costing and ABC. Standard Custom Direct labor costs    $50,000    $100,000...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to...
E17.1 Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Assign overhead using traditional costing and ABC. Standard Custom Direct labor costs    $50,000    $100,000...
VidPlayers, Inc. manufactures two types of DVD players, a deluxe model anda standard model. The deluxe...
VidPlayers, Inc. manufactures two types of DVD players, a deluxe model anda standard model. The deluxe model is a multi-format progressive-scan DVD player withnetworking capability, Dolby digital, and DTS decoder. The standard model’s primary fea-ture is progressive-scan. Annual production is 20,000 units for the deluxe and 50,000 unitsfor the standard.Both products require 2 hours of direct labor for completion. Therefore, total annualdirect labor hours are 140,000 or [2 hrs.±(20,000²50,000)]. Expected annual manu-facturing overhead is $980,000. Thus, the predetermined overhead rate...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT