Fogerty Company makes two products- titanium Hubs and Sprockets. Data regarding the two products follow:
Direct Labor-Hours per Unit Annual Production
Hubs............................................... 0.80 10,000 units
Sprockets....................................... 0.40 40,000 units
Additional information about the company follows:
a. Hubs require $32 in direct materials per unit, and Sprockets require $18.
b. The direct labor wage rate is $15 per hour.
c. Hubs require special equipment and are more complex to manufacture than Sprockets.
d. The ABC system has the following activity cost pools:
Activity cost pool (activity measure) Estimated overhead cost Hubs Sprockets Total
Machine setups 72,000 100 300 400
Special processing 200,000 5,000 0 5,000
General factory 816,000 NA NA NA
Required:
1. Compute the activity rate for each activity cost pool. Did you compute an activity rate for all of the activity cost pools? Why?
2. Determine the unit product cost of each product according to the ABC system.
1.Activity Rate is calculated as follows: | |||
Overhead | Cost | Driver Quantity | Rate/Activity |
Machine setups | 72,000 | 400 | 180 |
Special Processing | 200,000 | 5,000 | 40 |
General Factory | 816,000 | ||
No, not for general factory overheads since no driver available | |||
2.Calculation of cost | |||
Hubs | Sprockets | ||
Direct material per unit | 32 | 18 | |
Direct Labor per unit | 12 | 6 | |
Overheads: Activity Rate*Consumption/Number of units | |||
Machine Setups | 1.8 | 1.35 | |
Special Processing | 20.00 | 0 | |
Unit product cost | $65.80 | $25.35 |