Activity-Based Costing: Factory Overhead Costs
The total factory overhead for Bardot Marine Company is budgeted for the year at $925,250, divided into four activity pools: fabrication,, $459,000; assembly, $203,000; setup, $141,750; and inspection, $121,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity-base usage quantities for each product by each activity are as follows:
Fabrication | Assembly | Setup | Inspection | |||||
Speedboat | 6,750 | dlh | 21,750 | dlh | 49 | setups | 84 | inspections |
Bass boat | 20,250 | 7,250 | 356 | 591 | ||||
27,000 | dlh | 29,000 | dlh | 405 | setups | 675 | inspections |
Each product is budgeted for 2,500 units of production for the year.
a. Determine the activity rates for each activity.
Fabrication | $ per direct labor hour |
Assembly | $ per direct labor hour |
Setup | $ per setup |
Inspection | $ per inspection |
b. Determine the activity-based factory overhead per unit for each product. Round to the nearest whole dollar.
Speedboat | $ per unit |
Bass boat | $ per unit |
a | |||||
Fabrication | 17 | per direct labor hour | =459000/27000 | ||
Assembly | 7 | per direct labor hour | =203000/29000 | ||
Setup | 350 | per setup | =141750/405 | ||
Inspection | 180 | per inspection | =121500/675 | ||
b | |||||
Speedboat | Bassboat | ||||
Activity rate | Activity | Overhead allocated | Activity | Overhead allocated | |
Fabrication | 17 | 6750 | 114750 | 20250 | 344250 |
Assembly | 7 | 21750 | 152250 | 7250 | 50750 |
Setup | 350 | 49 | 17150 | 356 | 124600 |
Inspection | 180 | 84 | 15120 | 591 | 106380 |
Total | 299270 | 625980 | |||
Units | 2500 | 2500 | |||
Overhead per unit | 120 | 250 |