A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet using a 50-minute working hour. The soil has a swell of 15%. The loader has a bucket capacity of 2.5 cubic yards. The soil has a fill factor of 1.2 and a weight of 2,500 lbs per LCY. The loader has an STL of 50% of 15,000 lbs. The loader will haul in one direction loaded at 2.5 miles per hour and return at 3.5 miles per hour. The total cost of the tractor is $55.00 per hour.  It has a fixed time of .35 minutes. Remember that the loader will be moving the dirt in its loose state. What is the unit cost per LCY if Unit Cost = Total Cost / Productivity?

Homework Answers

Answer #1

Solution:

GIVEN DATA :

Productivity = (Load Volume) (Operational Efficiency) / Cycle Time,

LV = (BC)(FF),

OE = minutes worked per hour,

CT = FT + VT,

VT = HT and RT each = D/(R*88),

LV IS BC/FF,

= 2.5CUBIC.Y/1.2,

= 2.08 CUBIC YARDS,

OE IS M= TOTAL WORK FOR DAY IS 3.5/2.5 = 1.4 .

AND CT IS FT =VT WHERE (0.35+50)MIN IS 50.35MIN

FINALLY PRODUCTIVITY IS LV(OE)/CT

2.08X1.4/50.35 =0.058M3/MIN .

HERE NOTE : CT IS CYCLE TIME

OE IS OPERATIONAL EFFICIENCY

BC IS BUCKET CAPACITY

FC IS FILL FACTOR

LV IS LOAD VOLUME.

Please give a positive Rating.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet...
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet using a 50-minute working hour. The soil has a swell of 15%. The loader has a bucket capacity of 2.5 cubic yards. The soil has a fill factor of 1.2 and a weight of 2,500 lbs per LCY. The loader has an STL of 50% of 15,000 lbs. The loader will haul in one direction loaded at 2.5 miles per hour and return at...
A contractor plans to use a crawler tractor that is being used to move 5,000 BCY...
A contractor plans to use a crawler tractor that is being used to move 5,000 BCY of soil 500 feet horizontally in a 50 minute working hour. The soil has a swell of 15%. The tractor has a straight blade 10 feet long and 4 feet high. The average width of the base of the soil pile in front of the blade has been measured to be about 5 feet. Assume that the tractor travels in first gear forward at...
You are working for a contractor that has a contract for construction of a new residential...
You are working for a contractor that has a contract for construction of a new residential building. As part of the project, you need to remove the soil for the construction of the basement and foundation for a parking garage. From the project plans you know that 7,500 bank cubic yards must be excavated and that 1200 compacted cubic yards will be required to backfill the completed foundation. You plan to stockpile the soil needed for backfill on site and...
A contractor has just been awarded a contract to construct a parking lot for a small...
A contractor has just been awarded a contract to construct a parking lot for a small shopping center. The soil conditions are very poor, and the designer has decided to bridge over the poor material with a structural fill 3 feet deep. The total estimated volume of material required is 14000 compacted cubic yards. The fill material is a sandy clay weighing 2600 pounds per bank cubic yard. The swell for the fill material is estimated to be 25%, and...
A truck has a rated struck capacity of 8 cubic yards per hour. The soil has...
A truck has a rated struck capacity of 8 cubic yards per hour. The soil has a fill factor of 1.1. Operational efficiency is 45 minutes per hour. The truck has to travel 15 miles to the borrow site to get the dirt for the project. Its average speed is 45 mph empty and 35 mph on the return trip when loaded. It takes 3 minutes of fixed time to load and unload the truck. What is its hourly productivity?...