The Green Company makes boats from wood. Job 489 is to build 40 rowboats.
Job 489 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour.
Total cost for all jobs Total amount of activity for all jobs
Type of manufacturing overhead for the whole year for the whole year
Setup Cost $50,000 400 setups
Materials Handling 320,000 16,000 moves
Electricity 30,000 6,000 machine hours
_______
Total manufacturing overhead cost
for all jobs during the whole year $400,000
Please calculate the following if the Green Company uses activity based costing (the ABC method)::
The allocation rate for setup cost
The allocation rate for materials handling
The allocation rate for electricity
The direct materials cost of job 489
The direct labor cost of job 489
The manufacturing overhead cost applied to job 489 if job 489 requires 4 setups, 150 moves of materials, and 40 machine hours
The total cost of job 489
The cost per boat
a) allocation rate for setup cost = 50000/400 = 125 per setups
b) allocation rate for materials handling = 320000/16000 = 20 per moves
c) allocation rate for electricity = 30000/6000 = 5 per machine hour
d) The direct materials cost of job 489 = 1000*8 = $8000
e) The direct labor cost of job 489 = 60*25 = 1500
f) The manufacturing overhead cost applied to job 489 = (4*125+20*150+5*40) = 3700
g) The total cost of job 489 = (8000+1500+3700) = 13200
h) The cost per boat = (13200/40) = 330 per boat