Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its...

Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $1,591,000, consisting of the following activity cost pools for the current month:

Activity Centers Activity Costs Cost Drivers Activity Level
Assembly setups $ 330,000 Setup hours 2,000
Materials handing 162,000 Number of moves 600
Assembly 900,000 Assembly hours 18,000
Maintenance 199,000 Maintenance hours 1,990
Total $1,591,000

Total direct labor hours used during the month were 14,800. Panasonic produces many different electronic products, including the following two products produced during the current month:

Model X301 Model Z205
Units produced 3,500 3,500
Direct materials costs $34,000 $34,000
Direct labor costs $29,000 $29,000
Direct labor hours 700 700
Setup hours 60 120
Materials moves 30 60
Assembly hours 900 900
Maintenance hours 20 80

Required

a. Calculate the total per-unit cost of each model using direct labor hours to assign manufacturing overhead to products.
Round answers for unit cost to two decimal places, if applicable.

X301 Z205
Direct materials $Answer $Answer
Direct labor Answer Answer
Overhead Answer Answer
Total cost $Answer $Answer
Units Answer Answer
Unit cost $Answer $Answer

b. Calculate the total per-unit cost of each model using activity-based costing to assign manufacturing overhead to products.
Round answers for unit cost to two decimal places, if applicable.

X301 Z205
Total direct materials costs $Answer $Answer
Total direct labor costs Answer Answer
Overhead costs:
Assembly setup Answer Answer
Materials handling Answer Answer
Assembly Answer Answer
Maintenance Answer Answer
Total costs $Answer $Answer
Units produced Answer Answer
Unit cost $Answer $Answer

Homework Answers

Answer #1
1) overhead rate
1,591,000/14800
107.5 per direct labor hour
X-301 Z205
Direct materiald 34,000 34,000
Direct labor 29,000 29,000
overhead 75250 75250
total cost 138,250 138,250
units 3,500 3,500
unit cost 39.5 39.5
b)
X-301 Z205
total direct material cost 34,000 34,000
total direct labor cost 29,000 29,000
overhead costs:
Assembly setup 9900 19800
Materials handling 8100 16200
Assembly. 45000 45000
Maintenance 2000 8000
Total costs 128,000 152,000
units produced 3,500 3,500
unit cost 36.57 43.43
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its...
Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $636,400, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Assembly setups 132,000 Materials handling 64,800 Assembly 360,000 Maintenance 79,600 Total: 206,700 Cost Drivers Activity Level Setup hours 2,000 Number of moves 600 Assembly hours 18,000 Maintenance hours 1,990 Total direct labor hours used during the month were 14,800. Panasonic produces many different electronic products,...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
Atlanta Company is preparing its manufacturing overhead budget for 2017. Relevant data consist of the following....
Atlanta Company is preparing its manufacturing overhead budget for 2017. Relevant data consist of the following. Units to be produced (by quarters): 10,400, 12,100, 14,200, 17,000. Direct labor: Time is 1.5 hours per unit. Variable overhead costs per direct labor hour: indirect materials $0.70; indirect labor $1.30; and maintenance $0.70. Fixed overhead costs per quarter: supervisory salaries $36,850; depreciation $17,390; and maintenance $14,220. Prepare the manufacturing overhead budget for the year, showing quarterly data. (Round overhead rate to 2 decimal...
1. Activity Cost Pool Activity Measure Estimated Overhead Costs Expected Activity Machine Setup Number of Setups...
1. Activity Cost Pool Activity Measure Estimated Overhead Costs Expected Activity Machine Setup Number of Setups                                         20,000                                        50 Special Processing Machine Hours                                       200,000                                  8,000 General Factory Direct labor Hours                                       250,000                               12,500 Calculate the activity rate for the following: Machine Setup: ____________ Special Processing: ____________ General Factory: ____________ 2. Product A Product B Product C Direct Labor Costs $    40,000.00 $ 190,000.00 $ 50,000.00 Direct Materials $ 100,000.00 $ 120,000.00 $ 60,000.00 Number of Setups...
Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity...
Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity cost pools and cost driver levels for the latest period: Activity cost pool Activity cost Activity cost driver Machine setup $950,000 2,500 setup hours Material handling 520,000 5,000 material moves Machine operation 200,000 20,000 machine hours The following data are for the production of single batches of two products, Mirlite and Subdue: Mirlite Subdue Gallons produced 30,000 20,000 Direct labor hours 500 250 Machine...
Chang Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its...
Chang Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labor-hours (DLHs). The company has two products, Plain and Fancy, about which it has provided the following data: Plain Fancy Direct materials per unit $ 24.50 $ 59.30 Direct labor per unit $ 5.00 $ 25.00 Direct labor-hours per unit 0.20 1.00 Annual production 45,000 15,000 The company's estimated total manufacturing overhead for the year...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows: Direct material: 4 pounds at $10.00 per pound $40.00 Direct labor: 2 hours at $13 per hour $26.00 Variable overhead: 2 hours at $9 per hour    $18.00 Total standard variable cost per unit    $84.00 The Company also established the following cot formulas for its selling expenses:    Fixed Cost per month...
The following cost functions were developed for manufacturing overhead costs: Manufacturing Overhead Cost Cost Function Electricity...
The following cost functions were developed for manufacturing overhead costs: Manufacturing Overhead Cost Cost Function Electricity $200 + $20 per direct labor hour Maintenance $400 + $30 per direct labor hour Supervisors' salaries $20,000 per month Indirect materials $16 per direct labor hour The estimated manufacturing overhead = $218600 Question : discuss the role of direct labor hours in determining the predetermined overhead rates.
Russell Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its...
Russell Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labor-hours (DLHs). The company has two products, Slow and Fast, about which it has provided the following data: Slow Fast Direct materials per unit $ 14.10 $ 43.40 Direct labor per unit $ 3.20 $ 25.60 Direct labor-hours per unit 0.20 1.60 Annual production 48,000 33,000 The company's estimated total manufacturing overhead for the year...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity cost pool Activity cost Activity cost driver Machine setup $600,000 12,000 setup hours Material handling 60,000 2,000 tons of materials Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts: C23 Cams U2 Shafts Units produced 500 100...