Question

TG corp' s single predetermined overhead rate is $114 per direct labor hour. Under their ABC...

TG corp' s single predetermined overhead rate is $114 per direct labor hour. Under their ABC system they have 5 OH pools with the following rates: material handling $0.35 per part, lathe work $0.15 per lathe turn, milling $26 per machine hour, grinding $0.80 per part, and testing at $21 per unit tested. Based on the following information calculate the cost per unit for Job 421 using the ABC overhead system:

Direct material cost per job: $10,000 (job 420), $60,000 (job 421)

Direct manufacturing labor cost per job at $30/DLH: $750 (job 420), $12,000 (job 421)

Parts per job: 500 parts (job 420), 2,000 parts (job 421)

Lathe turns per job: 20,000 turns (job 420), 60,000 turns (job 421)

Machine hours per job: 170 MH (job 420), 970 MH (job 421)

Units per job (all units are tested): 10 unit (job 420), 200 units (job 421

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at...
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at $25 per machine hour. The company is considering adopting an activity-based costing system with the following data: Activity Cost Driver Rate Materials handling Pounds of material $1.50 Lathe work Number of parts $1.00 Milling Number of machine hours $8.00 Grinding Number of turns $0.40 Testing Number of units tested $15.00 The two jobs processed in the month of May had the following characteristics: Job...
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at...
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at $25 per machine hour. The company is considering adopting an activity-based costing system with the following data: Activity Cost Driver Rate Materials handling Pounds of material $1.50 Lathe work Number of parts $1.00 Milling Number of machine hours $8.00 Grinding Number of turns $0.40 Testing Number of units tested $15.00 The two jobs processed in the month of May had the following characteristics: Job...
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at...
Oxnard Company uses a volume-based costing system that applies overhead cost based on machine hours at $25 per machine hour. The company is considering adopting an activity-based costing system with the following data: Activity Cost Driver Rate Materials handling Pounds of material $1.50 Lathe work Number of parts $1.00 Milling Number of machine hours $8.00 Grinding Number of turns $0.40 Testing Number of units tested $15.00 The two jobs processed in the month of May had the following characteristics: Job...
Mickley Company’s plantwide predetermined overhead rate is $24.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $24.00 per direct labor-hour and its direct labor wage rate is $15.00 per hour. The following information pertains to Job A-500: Direct materials $ 280 Direct labor $ 300 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 80 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) Mickley Company’s plantwide predetermined overhead rate is $24.00...
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $10.00 per hour. The following information pertains to Job A-500: Direct materials $ 230 Direct labor $ 150 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 50 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1.Total manufacturing cost 2.Unit product costper unit. per...
Mickley Company’s plantwide predetermined overhead rate is $19.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $19.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-500: Direct materials $ 240 Direct labor $ 260 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 90 units, what is the unit product cost for this job?
Mickley company's plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage...
Mickley company's plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $11.00 per hour. The following information pertains to job A-500: Direct materials $250 Direct labor $165 Required: 1. What is the total manufacturing cost assigned to job A500? 2. If job A500 consists of 80 units, what is the unit product cost for this job? (Round your answer to 2 decimal places) 1.total manufacturing cost__________ 2.unit product cost _______________per unit
Mickley Company’s plantwide predetermined overhead rate is $22.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $22.00 per direct labor-hour and its direct labor wage rate is $11.00 per hour. The following information pertains to Job A-500 Direct Materials: $280 Direct Labor: $55 a) What is the total manufacturing cost assigned to Job A-500? b) If Job A-500 consists of 50 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-500: Direct materials $ 240 Direct labor $ 260 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 30 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)
5. Assume (1) a company’s plantwide predetermined overhead rate is $13.00 per direct labor-hour, and (2)...
5. Assume (1) a company’s plantwide predetermined overhead rate is $13.00 per direct labor-hour, and (2) its job cost sheet for Job X shows that this job incurred direct materials and direct labor charges of $500 and $360, respectively. If Job X’s total job cost is $1,289, how many direct labor-hours were worked on this job? 6. Assume (1) actual machine-hours worked during the period of 54,000 hours, (2) estimated machine-hours to be worked during the period of 55,600 hours,...